Similar Projects
FPL Orange Blossom Solar Energy Center
New Construction
Design
Vero Beach, FL 32968

Unit 5 SCR Catalyst Replacement at Mcintosh Power Plant
Post-Bid
Lakeland, FL 33801

Unit #5 Combustion Turbine Inlet Filter Cartrige Replacements
Results
Lakeland, FL 33801

300+ Mega-Watt Solar Farm
New Construction
Pending Verification
Daytona Beach, FL

HCA Davie Hospital and Medical Center
New Construction - 905,330 SF
Construction
$220,000,000 est. value
Davie, FL 33328

FPL Grove Solar Energy Center
New Construction
Design
Vero Beach, FL 32966

Bag and Cage Replacement for Deerhaven 2
Results
Less than $556,075 est. value
Gainesville, FL 32653

Solar Plant
New Construction
Design
$150,000,000 est. value
Crystal River, FL

Unit 5 Hot Reheat (HRH) ByPass Valve Replacement at Mcintosh Power Plant
Post-Bid
Lakeland, FL 33805

Unit 3 Ball Mill Lifters Replacement at McIntosh Power Plant
Post-Bid
Lakeland, FL 33805

Combined Cycle Facility
New Construction
Design
$727,000,000 est. value
Palatka, FL

Kennedy Generation Station Control Room Construction Project
Results
Jacksonville, FL 32206

Central Energy Plant, (UF Main Campus)
Post-Bid
Less than $200,025,548 est. value
Gainesville, FL 326115

Discovery Solar Energy Center
New Construction
Design
$100,000,000 est. value
Merritt Island, FL 329953

Last Updated 03/24/2021 08:08 AM
Project Title

Combustion Turbines HMI Upgrade Project

Physical Address View project details and contacts
City, State (County) State-Wide: FL
Category(s) Industrial/Manufacturing
Sub-Category(s) Power Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this solicitation is to contract for the supply, installation, and commission HMI upgrades of all four (4) NGS Gas turbines, accomplish a network switch upgrade, and replacement of a non-functioning Advantech screen. There are a total of four (4) commercial grade Human Machine Interfaces and two (2) commercial grade tower stations with Human Machine Interfaces included. Services include but are not limited to: • Technical Engineering • Materials procurement • Integration and programming • Delivery • Installation • Commissioning • Reports & Project documentation

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Fossil Fuel Plant Electrical Power Generation Equipment, Fossil Fuel Electrical Power Plant Gas Turbines, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents