Similar Projects
Equipment Painting and Rehabilitation at Various Locations
Renovation
Bidding
$63,000 CJ est. value
Chicago, IL 60604

Dorothy Drennon Park
Infrastructure
Bidding
$60,000 CJ est. value
Oakbrook Terrace, IL 60181

Traffic Operations Center and Dispatch Center Renovation - Electrical / IT
Renovation
Sub-Bidding
$8,071,037 CJ est. value
Downers Grove, IL 60515

Westview Concrete Porch
Alteration
Post-Bid
Quincy, IL 62301

Concrete Materials for 2022 Public Works Maintenance
Alteration
Post-Bid
Centralia, IL

Pin & Link Assembly Expansion Joint Retrofits 4
Alteration
Results
Chicago, IL

Concrete - Various Sites District Wide Plus Alternative Work
Alteration
Results
Algonquin, Carpentersville, IL 60102

Construction of Arenzville Rural Water Cooperative Phase III
Infrastructure
Construction
$1,519,702 CJ est. value
Arenzville, IL 62611

Construction of Arenzville Rural Water Cooperative Phase III
Infrastructure
Construction
$1,519,702 CJ est. value
Arenzville, IL 62611

Concrete Materials
Alteration
Post-Bid
Saint Charles, IL

Sidewalk/Driveway/Apron and Curb and Gutter Concrete Replacement
Infrastructure, Alteration
Results
Darien, IL

Concrete Lifting Services
Alteration
Post-Bid
Saint Charles, IL

Berg Instructional Center Concrete Repairs
Alteration
Results
Glen Ellyn, IL 60137

Concrete Replacement Program
Alteration
Post-Bid
Morton Grove, IL

Miscellaneous Concrete Repairs
Alteration
Results
Batavia, IL 60510

Last Updated 06/26/2023 07:22 PM
Project Title

Emergency Installation of Temporary & Permanent Chiller

Physical Address View project details and contacts
City, State (County) East Moline, IL 61244   (Rock Island County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $984,600 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of June 26, 2023, this project has not yet been awarded . A timeline for award has not yet been established. The scope of work for the project will include replacement of the Administration Building chilled water system steam absorption chiller with an electric screw chiller utilizing a remote evaporator. The project scope will also include modification to the chilled water distribution system within the chiller plant. Variable speed drives and grounding rings will be added to existing pumps (and motors replaced as necessary). CDB’s Rights. When, in its opinion, it is in the best interest of the State, CDB reserves the right to: A. Accept any bid B. Reject any or all bids C. Waive technical deficiencies and irregularities D. Allow bidder to remedy technical deficiencies or irregularities within a stated time E. Rescind any notice of award if CDB determines the notice of award was issued in error F. Rescind any notice of award when it is in the best interest of the State G. Rebid any contract Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Prevailing Wage Act (820 ILCS 130/1-12). COST RANGE under $2,500,000. For additional assistance related to the e-Builder system, email CDB@OnIndus.com. Questions submitted through the e-Builder module will not reviewed or responded to.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents