Similar Projects
Downtown Square Streetscape Improvements
Infrastructure
Bidding
$1,200,000 CJ est. value
Tallassee, AL 36078

Downtown Square Streetscape Improvements
Infrastructure
Bidding
$1,200,000 CJ est. value
Tallassee, AL 36078

Striping and Related Traffic Control Markings for a Parking Lot at the Wetumpka Recreational Facility
Infrastructure
Post-Bid
Wetumpka, AL 36093

Sidewalks, Curb and Gutter and Miscellaneous Concrete Work
Infrastructure
Post-Bid
Wetumpka, AL

Downtown Utility Relocation
Infrastructure
Results
est. value
Tallassee, AL

Constructing the Widening, Resurfacing, and Traffic Stripe on Camp Grandview Road
Infrastructure
Results
$484,475 to $592,136 est. value
AL

Diamond Oaks - Phase 2: Sewer Manhole Rehabilitation Project
Infrastructure
Construction
$910,405 CJ est. value
Millbrook, AL 36054

Diamond Oaks - Phase 2: Sewer Manhole Rehabilitation Project
Infrastructure
Construction
$910,405 CJ est. value
Millbrook, AL 36054

Annual Paving
Infrastructure
Post-Bid
AL

Jakes and Patterson Street Sidewalk Project
Infrastructure
Results
Tallassee, AL 36078

Micro Surfacing
Infrastructure
Post-Bid
AL

Constructing the Widening, Planning, Resurfacing, and Traffic Stripe on Jasmine Hill Road
Infrastructure
Results
$1,027,749 to $1,256,137 est. value
AL

Milling
Infrastructure
Post-Bid
AL

Planing, Resurfacing, and Traffic Stripe on Cobbs Ford Road/ Alabama River Parkway
Infrastructure
Results
$1,287,994 CJ est. value
Millbrook, AL 36054

2022 Rebuild Alabama Paving
Infrastructure
Post-Bid
AL

Last Updated 11/28/2022 07:33 AM
Project Title

Safety Improvements (Curb Ramp Installations and Improvements) on SR-14, SR-63, SR-111, SR-143, and SR-229 at Various Locations

Physical Address View project details and contacts
City, State (County) Tallassee, AL 36078   (Elmore County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $206,560 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County : Elmore Constructing the Safety Improvements (Curb Ramp Installations and Improvements) on SR-14, SR-63, SR-111, SR-143, and SR-229 at various locations in the Southeast Region (Montgomery Area) as indicated in the plans. The Bracket Estimate on this project is from $163,990 to $200,433 . Contract Time: 45 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 008 - Safety Improvements (Curb Ramp Installations and Improvements) on SR-14, SR-63, SR-111, SR-143, and SR-229 at Various Locations *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents