Similar Projects
SLBE Vernon Court Sidewalks (West Side)
Infrastructure
Bidding
$300,000 est. value
Raytown, MO 64133

Concrete and Brick Removal/Replacement and Complete Sidewalk Installation
Infrastructure, Alteration
Bidding
$736,340 est. value
Saint Louis, MO

Shelby County R-IV School District-Parking Lot Improvements
Post-Bid
$850,000 est. value
MO

2021 Sidewalk Replacements
Post-Bid
Saint Joseph, MO

Subdivision and Parking Lot Pavement Surface Preservation and Crack Seal
Results
$317,318 est. value
MO

Sidewalk Maintenance and Curb Ramp Construction
Term Contract
Results
$1,700,000 est. value
Springfield, MO

Olivette Apartments
New Construction, Alteration
Pending Verification
Olivette, MO 63132

Pedestrian Crossing Downtown
New Construction, Infrastructure
Pending Verification
$278,000 est. value
Columbia, MO

Fassnight Creek Greenway Trail
Infrastructure
Bidding
$700,000 est. value
Springfield, MO

Sidewalks
Infrastructure
Post-Bid
Iberia, MO

Sidewalk Brick Band Replacement
Results
Kirksville, MO

Chicken N Pickle
New Construction, Term Contract - 32,923 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Saint Charles, MO

East 21st Street Sidewalks (North Side) from Agnes Avenu to Walrond Avenue
Infrastructure
Bidding
$200,000 est. value
Kansas City, MO 64121

Seal and Restripe the Asphalt Parking Lots
Infrastructure
Post-Bid
Lathrop, MO

Parks Parking Lots and Trail Sealing
Results
Maryland Heights, MO

Last Updated 07/12/2022 01:03 AM
Project Title

Public Improvements for Third Street Sidewalks

Physical Address View project details and contacts
City, State (County) Battlefield, MO 65619   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of sidewalks from State Rte. FF along 3rd Street, 3rd Street to 4th Street along Clarborne Street, and Clarborne Street to Tower Drive along 4th Street / Elm Street. In addition to new sidewalk, the project includes grading, driveway reconstruction, minor storm work, and all other miscellaneous work required for completion of the project.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents