Similar Projects
2020 or Newer T76 Bobcat Compact Track Loader and Brushcat, H-72" Mower Attachment r Equal
Alteration
Bidding
$74,000 to $80,000 est. value
San Diego, CA 92104

Kitchen Equipment for Nutrition Services
Alteration
Bidding
Costa Mesa, CA 92627

Material Handling Equipment Inspection and Repair Services
Post-Bid
Fairfield, CA - San Antonio, TX - Tacoma, WA 78226

2021 or Newer One (1) Propane Forklift
Alteration
Post-Bid
CA

Steamers Building Maintenance Platform
Alteration
Results
$170,000 est. value
Sacramento, CA

Short-Term Rental of Heavy Equipment Gravel Screening and Washing Equipment
Alteration
Results
Sacramento, CA

CHP Santa Nella Platform Scale Maintenance
Alteration
Bidding
Lebec, CA 93243

Lec Inlet Filter Platform Extension Construction
Alteration
Post-Bid
Lodi, CA 95242

Grapevine-Scale Maintenance
Alteration
Bidding
Lebec, CA 93243

7320--Meal Tray System Replacement
Term Contract
Post-Bid
Livermore, Menlo Park, Palo Alto, CA

Chip Spreader Bearcat Model-Tandem 8-16 Chipper, or Equivalent
Alteration
Bidding
CA

Dishwasher Replacement
Term Contract
Post-Bid
Fairfield, Travis AFB, CA 94535

Junior Lifeguard Facility Modular Building
New Construction, Term Contract - 960 SF
Bidding
$300,000 est. value
Long Beach, CA 90803

Classroom Addition Data and Av Equipment
Alteration
Bidding
Heber, CA 92249

Supply of General Construction Services
Demolition, Alteration
Bidding
Redwood City, CA 94063

Reported 08/28/2021 12:00 AM
Project Title

Rack Removal and Warehouse Reconfig/Update

Physical Address View project details and contacts
City, State (County) Edwards, CA 93524   (Kern County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove single sided rack systems, relocate sufficient quantity to create additional storage in warehouse 03A, and dispose off base of all unused racks from B3736, warehouse 05A. Grind off all floor studs used to secure racks as to prevent a tripping hazard. Leave area clean and free of all deconstruction items. (see SOW 1.1.1 for details) Remove antiquated warehouse rack system as identified. Reconfigure existing rack system shelving. Install sufficient portion of rack system from warehouse 05A to create row in warehouse 03A. Contractor will provide all materials, equipment, and tools to execute the contract. (see SOW 1.2.1 for details) Installed guard and rack system has no known stock number. Unit is approx. 165 feet long by 6 feet wide and 20 feet high. Remove approximately 170 feet of guard from the floor in front of the rack system and dispose of all material. Remove rack system approximately 165 feet long and approximately 20 feet high and dispose of all material. After removal, cut all bolts off at floor level to prevent tripping hazard. Estimated Start date 13 Sep 2021 and Estimated Completion 25 Oct 2021. Remove guard and rack system using roll up cargo door located on the west side of building 3736. Method for removal of guard and rack system will be determined by the contractor and all components will be removed from Edwards AFB and disposed of as determined by the contractor.

Details

Division 10 - Specialties, Storage Assemblies.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents