Similar Projects
Last Updated | 08/05/2021 10:10 AM |
Project Title | Freeport Harbor Levee Stabilization Wall Project |
Physical Address | View project details and contacts |
City, State (County) | Freeport, TX 77541 (Brazoria County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work for this project shall consist of installing approximately 3000 linear feet Pipe – AZ Combiwall system of 42” dia. pipe piles and AZ38-700N sheetpiles as part of a levee stabilization system around the Dow Thumb of the channel. Construction installation will be via the channel/waterside. The project will also consists of removing the existing concrete rubble shoreline protection and installing a new concrete revetment slope protection system, coating system of the combiwall system, cathodic protection, fencing and solar lighting. Typical depth of piles will range from ~ – 58 FT to -94 FT in lengths. Procurement Acquisition will be by Port Freeport. Estimated construction completion is June 2020. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |