Similar Projects
FY21 USACE Galveston District, FY21 Houston Ship Channel Oyster Mitigation, Harris County, Texas
Term Contract
Design
$10,000,000 to $25,000,000 est. value
Houston, TX

Avellino Detention Pond
Infrastructure
Bidding
Manvel, TX

Chocolate Bayou Detention Basin T Phase 2, Detention Basin V and Earthwork to Serve Meridiana
Infrastructure
Bidding
Houston, TX

Water, Sanitary Sewer, Drainage, and Paving Facilities for Sterling Lakes Drive Street Dedication
Post-Bid
TX

Reinforced Concrete Storm Sewer Box Culverts Annual Contract
Term Contract
Post-Bid
Pearland, TX 77581

Water, Sanitary Sewer, and Drainage Facilities to Serve Bluewater Lakes Section 6
Results
TX

Holiday Lakes Flood and Drainage Improvements
Results
$671,062 est. value
Angleton, TX 77515

West Fork of Chocolate Bayou Detention Basin O Phase 2, Detention Basin P and Earthwork to serve Meridiana
Infrastructure
Bidding
TX

Mustang Bayou Bank Repair at National Oaks Park
Post-Bid
Alvin, TX 77511

Construction of Water, Sanitary, and Drainage Facilities for Sierra Vista West Section 5
Results
$2,121,300 est. value
TX

Water, Sanitary Sewer, Drainage Facilities to Serve Caldwell Ranch Section 7
Infrastructure
Bidding

Piper Road Drainage Project
Post-Bid
Pearland, TX

Construction of Water, Sanitary, and Drainage Facilities for Sierra Vista West Section 4
Results
$3,371,000 est. value
TX

CDBG-DR Drainage and Paving Improvements
Post-Bid
Holiday Lakes, TX

Water Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Savannah County Road 58 Phase V
Results
TX

Last Updated 08/05/2021 10:10 AM
Project Title

Freeport Harbor Levee Stabilization Wall Project

Physical Address View project details and contacts
City, State (County) Freeport, TX 77541   (Brazoria County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for this project shall consist of installing approximately 3000 linear feet Pipe – AZ Combiwall system of 42” dia. pipe piles and AZ38-700N sheetpiles as part of a levee stabilization system around the Dow Thumb of the channel. Construction installation will be via the channel/waterside. The project will also consists of removing the existing concrete rubble shoreline protection and installing a new concrete revetment slope protection system, coating system of the combiwall system, cathodic protection, fencing and solar lighting. Typical depth of piles will range from ~ – 58 FT to -94 FT in lengths. Procurement Acquisition will be by Port Freeport. Estimated construction completion is June 2020.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents