Similar Projects
Plumbing Mechanical Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Geneva, IL

2022 On-Call Lead Water Service Line Replacement
Infrastructure
Post-Bid
Aurora, IL

Aerial Spraying of Aquatic Glyphosate Herbicide
Term Contract
Results

HVAC Mechanicals Maintenance and Repair Services
Term Contract, Alteration
Results
IL

2022 Annual Tree Trimming
Term Contract, Alteration
Post-Bid
Carpentersville, IL

QBS DOIT Professional Fiber Engineering Services
Renovation, Infrastructure
Post-Bid

Citywide Mowing Landscape Maintenance
Term Contract, Alteration
Post-Bid
Aurora, IL

Junk and Trash Removal
Term Contract, Alteration
Post-Bid
Aurora, IL

Street Sweeping Services
Term Contract, Alteration
Post-Bid
Geneva, IL

Right Of Way Mowing Land Management
Alteration
Post-Bid
Elgin, IL

2022 Annual City Landscaping Repair and Maintenance
Term Contract, Infrastructure, Alteration
Post-Bid
Aurora, IL

6 Ton Bard Unit
Alteration
Post-Bid
Geneva, IL

Fiber Optic Support Services
Term Contract, Alteration
Post-Bid
Geneva, IL

Job Order Contracting
Term Contract
Post-Bid

Parks and Streets Landscaping Maintenance
Term Contract, Infrastructure
Post-Bid
Aurora, IL 60506

Last Updated 12/12/2022 11:34 AM
Project Title

FY 2022-23 Keslinger Road and Delnor Substation Preventive Maintenance

Physical Address View project details and contacts
City, State (County) Geneva, IL 60134   (Kane County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A maintenance cycle on the Power Transformer and Load Tap Changer at each substation. All relay settings and schemes will be tested and verified along with proper operation and timing of the associated circuit breakers. The standby substation service battery at Keslinger substation will be fully load tested. An optional project, based on budget for labor & parts, will be the install of new bearing half segments at the left phase by-pass switch shaft at Delnor Sub see EXHIBIT D for details, such cost can be added to page 17, section 5 respectively. The Contractor and Sub-Contractors shall pay not less than the prevailing rate of wages as found by the Department of Labor or as determined by the Court of Appeal, to all laborers, workmen and mechanics performing work under the Contract. A signed certification stating the above as well as the fact that the Bidder is not barred from Bidding as a result of a violation of either Section 33E-3 or 33E-4 of Chapter 38, Illinois Revised Statues, 1987 (as amended) must be submitted with the sealed Bid. Each Bid must be accompanied by a Bid bond signed by a Surety company authorized to do business in Illinois, or by a cashier's check or certified check in the amount of ten (10) percent of the base Bid. Any Bid not accompanied by a required Bid deposit will be rejected. The City of Geneva, IL reserves the right to reject any or all Bids and waive technicalities.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents