Similar Projects
Stop N Store - Bloomingdale
New Construction, Infrastructure - 82,000 SF
Conception
$8,000,000 CJ est. value
Bloomingdale, GA 31302

Grading and Graveling (Polk Street)
Infrastructure
Design
$200,000 CJ est. value
Tybee Island, GA 31328

Grading and Graveling (Polk Street)
Infrastructure
Design
$200,000 CJ est. value
Tybee Island, GA 31328

RFP D/B - Construct ACS Weapons System Facility
New Construction, Infrastructure - 3,000 SF
Bidding
$5,000,000 CJ est. value
Savannah, GA 31408

SPIP Megasite Clearing and Grading
Infrastructure
Bidding
$10,000,000 CJ est. value
Bloomingdale, GA 31302

Cable Barriers Upgrade
Infrastructure
Sub-Bidding
$600,000 CJ est. value
Savannah, GA 31406

Test Pit Excavation and Potential Removal of Underground Storage Tank
Infrastructure
Post-Bid
Savannah, GA

DOT Local Maintenance Improvement Grant (I-MIG)
Infrastructure
Post-Bid
Bloomingdale, GA

2021 LMIG Project
Results
Mount Vernon, GA

2021 LMIG Road Improvements
Results
Garden City, GA 31405

Eastern Wharf F/K/A Savannah River Landing - Phase I
New Construction - 120,000 SF
Construction
$225,000,000 est. value
Savannah, GA 31405

North Dekalb Mall
New Construction - 500,000 SF
Pending Verification
Atlanta, Decatur, GA 30033

Hyundai Motors Electric Vehicle And Battery Manufacturing Plant
New Construction, Infrastructure
Pending Verification
$5,500,000,000 CJ est. value
Savannah, GA 31405

Construct Gate Complex Robert B. Miller Jr. Road
Infrastructure, Renovation
Design
$10,000,000 CJ est. value
Savannah, GA 31401

Sallie Mood Drive/Agonic Road Force Main Replacement - Phase II
Infrastructure
Bidding
$190,000 CJ est. value
Savannah, GA 31406

Last Updated 08/11/2022 08:32 AM
Project Title

Downtown East Office Complex - Phase 3

Physical Address View project details and contacts
City, State (County) Savannah, GA 31404   (Chatham County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 11, 2022, no current planning applications have been submitted to the city. Information regarding the architect and the general contractor is not available at this time. A construction timeline has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2 Stories Above Grade, 23,700 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents