Similar Projects
Z--INDE 236306-Replace Chiller Plants/Cooling Towers
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Philadelphia, PA 19106

HVAC Maintenance Services
Term Contract
Design
Downingtown, Hatboro, Philadelphia, PA

Major HVAC Renovation at Potter Thomas School - General
Alteration
Bidding
$316,119 est. value
Philadelphia, PA 19133

Neshaminy New Maple Point Elementary School - HVAC Construction
Alteration
Bidding
Langhorne, PA 19047

BOILER SERVICE/REPAIR AND WATER TREATMENT
Post-Bid
Philadelphia, PA

Design-Bid-Build (DBB), Building 633 River Water Cooling System, Philadelphia Naval Business Center (PNBC), Philadelphia, PA
Post-Bid
$5,000,000 to $10,000,000 est. value
Philadelphia, PA 19092

High School North Administration HVAC Replacement
Results
Newtown, PA 18940

Machine Chiller Semi-Annual Preventative/Corrective Maintenance for NFPC
Results
Philadelphia, PA 19112

HVAC/AIR FLOW | Roof Ventilation Installation
Infrastructure
Bidding
Philadelphia, PA

HVAC & Duct Cleaning and Fiber Lock Sealing
Post-Bid
Philadelphia, PA 19112

Chillers and Hotwater/Glycol Pipeline Replacement at Northeast Water Pollution Control Plant
Results
$4,000,000 to $5,000,000 est. value
Philadelphia, PA 19137

Boiler Replacement
Renovation
Post-Bid
Philadelphia, PA 19151

HVAC Maintenance/Repairs - Branches and Regionals
Term Contract
Results
Philadelphia, PA

Computer Room Upgrades - USBC
Post-Bid
Philadelphia, PA 19106

Uni-Vent and Temperature Control Replacement at John F. Hartranft Elementary School - General
Results
Less than $160,423 est. value
Philadelphia, PA 19133

Reported 03/25/2022 12:00 AM
Project Title

HVAC/Air Flow | Repair and Upgrade Air Handler RTU3 - PHILA

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19104 (Bucks, Philadelphia Counties)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

• The selected vendor/contractor will provide all labor, material, and equipment necessary to remove, replace, and verify correct functionality of the steam and chilled water coils in the RTU3 Air Handler. Also, the vendor/contractor will update functionality of the controls from pneumatic to electronic, replace degraded duct insulation, and test / balance the air flow rates to the spaces served by this Air Handler.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents