Similar Projects
Reported | 06/21/2022 12:00 AM |
Project Title | Project Development On-Call - ADOT Pedestrian and Bicycle Northwest Group RSA Project |
Physical Address | View project details and contacts |
City, State (County) | State-Wide: AZ |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications, Construction Start Expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | District: Statewide Route/MP: Various Funding Source: HSIP Safety Assessment of various high pedestrian and bicycle crash intersections and segments of the state highway system. Project will include analysis of crash characteristics, current operational data (speed and volume of vehicle pedestrian and bicycle traffic), and planned construction and projected future operational characteristics. Work includes field review of locations and may require survey of existing roadway configurations. ADOT is interested in demonstrating cause and effect relationships between proposed solutions and expected outcomes. As such, the intent of these RSAs is to develop proposed solutions for documented pedestrian and bicycle crash histories that can be translated directly into future state funded projects or Highway Safety Improvement Program (HSIP) applications Final report will include: 1. Recommendations for possible low-cost, near-term changes to the road characteristics to improve safety and operations. 2. Crashes likely affected by implementation of these changes 3. Crash modification factors (CMF) from FHWA CMF Clearinghouse or approximate CMFs based on peer reviewed literature for the proposed changes 4. Concept level design estimates of the changes 5. Concept level benefit cost ratios of proposed changes 6. Review and comment on the adequacy or appropriateness of existing ADOT pedestrian and bicycle standards implemented at the RSA site Northwest SR 95/Joy Lane - MP 236.5 (Pedestrian Safety Action Plan (PSAP) - High Crash (HC), Transportation Systems Management and Operations (TSMO)) Fort Mohave SR 95 MP 244-249 (Bicycle Safety Action Plan (BSAP) - HC and High Risk (HR)) Bullhead City SR69 MP 286-289.7 (PSAP - HR) Prescott Valley US 60: MP 143-146.3 (BSAP - HC and HR, PSAP - HC and HR, TSMO) NE Phoenix Metro PSAP: US 60 MP 143.0-145.0, HC Segment 13 PSAP: US 60 MP 145.0-146.3, HR Segment 10 US 60/Bethany Home (PSAP - HR, TSMO) NE Phoenix Metro |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |