Similar Projects
County Road R74 Paving Project - County of Winnebago
Infrastructure
Conception
$750,000 CJ est. value
Forest City, IA 50436

County Road R74 Paving Project - County of Winnebago
Infrastructure
Conception
$750,000 CJ est. value
Forest City, IA 50436

HMA Resurfacing / Heater Scarification - A38, R74, A34
Infrastructure
Bidding
$1,250,000 CJ est. value
Leland, IA 50453

HMA Resurfacing / Heater Scarification - A38, R74, A34
Infrastructure
Bidding
$1,250,000 CJ est. value
Leland, IA 50453

PCC Patching
Infrastructure
Results

Granular Surfacing of Roadway
Infrastructure
Results

Winnebago County Public Health Building Expansion - Winnebago County
Addition, Demolition, Infrastructure
Pending Verification
$800,000 CJ est. value
Forest City, IA 50436

Winnebago County Public Health Building Expansion - Winnebago County
Addition, Demolition, Infrastructure
Pending Verification
$800,000 CJ est. value
Forest City, IA 50436

G-17-N1 Bridge Replacement - 27078 - County of Winnebago
Demolition, Infrastructure
Conception
$280,000 CJ est. value
Buffalo Center, IA 50424

A16 - HMA Resurfacing/Cold in-Place Recycling
Infrastructure
Results
IA

E-9-W1 Bridge Replacement - 37060 - County Winnebago
Demolition, Infrastructure
Conception
$500,000 CJ est. value
Forest City, IA 50436

Rake Area Paving on 500th St - 50869 County of Winnebago
Infrastructure
Conception
$900,000 CJ est. value
Leland, IA 50453

Last Updated 10/17/2022 04:14 AM
Project Title

HMA Crack Filling

Physical Address View project details and contacts
City, State (County) Leland, IA 50453   (Winnebago County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Id : 221018 R2 PROJECT IDENTIFICATION NUMBER - 23-41-018-010, 23-46-169-010, 23-55-009-010, 23-95-009-010 MP-018-2(713)163-76-41 County : Hancock Working Days : 35 Projects Included: MP-009-2(710)115--76-55 ROUTE: IOWA 9 In Swea City, from the WCL to the ECL MP-009-2(711)133--76-95 ROUTE: IOWA 9 From WCL Buffalo Center to E of Co Rd R20 and 2 mi W of US 69 to US 69 MP-018-2(711)173--76-17 ROUTE: U.S. 18 In Clear Lake, from N 16th St W east to near N 24th St MP-018-2(713)163--76-41 ROUTE: U.S. 18 From Country Club Lane in Garner to Co Rd S18 in Clear Lake MP-169-2(708)172--76-46 ROUTE: U.S. 169 In Humboldt, from Willow Ridge Dr to IA 3 MP-169-2(709)174--76-46 ROUTE: U.S. 169 In Humboldt, from IA 3 north to 16th Ave N, including 0.28 mi on IA 3 E of US 169 Estimated Value : $250,000 - $500,000 Unless otherwise specified, a bidder shall submit a proposal as per Article 1102.09 of the Standard Specifications. Proposals received after the bid deadline will not be read. Proposals containing any reservations not provided for in the forms furnished will be rejected. The Iowa DOT reserves the right to waive technicalities and reject any or all bids. Unless otherwise specified, a bidder must submit a proposal guaranty/bid bond with each bid as per Article 1102.11 of the Standard Specifications. Failure to execute a contract and file an acceptable performance bond and certificate of insurance within 30 days of the approval date for awarding the contract will be just and sufficient cause for the denial of the award and forfeiture of the proposal guaranty. The Iowa DOT (or other approved contracting authority) hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Minimum wage rates for all federal-aid projects have been predetermined by the U.S. Secretary of Labor and are set forth in the specifications. However, this does not apply to projects off the federal-aid highway system. All federal-aid projects are subject to the Contract Work Hours Standards Act, as amended (title I of Pub. L. 87-581, Aug. 13, 1962, 75 Stat.357) and implementing regulations. IADOT - 202 - HMA Crack Filling *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents