Similar Projects
Restroom Remodeling In South Facility - 540 - City Of La Crosse
Build-out
Conception
$360,000 CJ est. value
La Crosse, WI 54601

Roof Replacement For South Hall A And Lobby - 643 - City Of La Crosse
Renovation
Conception
$700,000 CJ est. value
La Crosse, WI 54601

Prairie Heights Residences
New Construction, Infrastructure - 9,168 SF
Design
$40,000,000 CJ est. value
Eau Claire, WI 54703

New Milwaukee Public Museum
New Construction, Infrastructure - 230,000 SF
Design
$240,000,000 CJ est. value
Milwaukee, WI 53202

New Elementary School - Oshkosh School District
New Construction, Infrastructure - 116,331 SF
Bidding
$35,480,000 CJ est. value
Oshkosh, WI 54901

Roof Replacement Fischer and Goodhue Hall
Renovation
Bidding
$688,000 CJ est. value
Whitewater, WI 53190

Columbus Elementary School
Renovation
Post-Bid
Columbus, WI 53925

Machickanee Boat Landing - Site Redevelopment
Post-Bid
Stiles, WI

Grassed Waterway System & Wetland Restoration
Results
Germantown, WI

Cormier School and Early Learning Center and Pioneer School Office and Entrance
Renovation, Addition - 11,230 SF
Results
Green Bay, WI 54304

Stateline Boys and Girls Club
New Construction, Renovation - 22,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Beloit, WI 53511

Oriole Lane Elementary School
New Construction
Construction
Mequon, WI 53097

Drew Tower
New Construction, Infrastructure - 80,000 SF
Pending Verification
$50,000,000 CJ est. value
Wauwatosa, WI 53226

Washington Avenue Multi-Family
Demolition, New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Racine, WI 53403

Building Improvements - 2022 bond - Ladysmith School District
Addition, Demolition, New Construction, Infrastructure, Renovation
Conception
$21,000,000 CJ est. value
Ladysmith, WI 54848

Last Updated 12/08/2022 03:43 PM
Project Title

Chilton New Stadium and Elementary School Addition and Renovations

Physical Address View project details and contacts
City, State (County) Chilton, WI 53014   (Calumet County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Elementary School, Site Development, Stadium
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope consists of but is not limited to new athletic stadium and approximately 9,600 square feet of new construction, remodel area of 35,814 square feet and mechanical mezz of 977 square feet. Sections included but not limited to: site demolition, earthwork, paving, athletic track surfacing, fences and gates, seed-sod-plants, site concrete, site utilities, cast-in-place concrete, precast architectural concrete, masonry, structural steel, joist and deck, cold-formed metal framing, selective demolition, rough carpentry, cabinets and countertops, fiberglass paneling, waterproofing, insulation, EIFS, wall panels, membrane roofing, sheet metal, intumescent fire protection, firestopping, joint sealants, doors, frames, hardware, wood doors, fiberglass doors, access doors, alum framed storefronts, curtain wall, skylights, glazing, gypsum board, ceramic tile, acoustical ceilings, athletic flooring, res. flooring, tile carpeting, sound absorbing units, painting, visual display units, signage, plastic toilet compartments, toilet accessories, fire protection specialties, flagpoles, gymnasium equipment, athletic field equipment, scoreboard, plumbing, HVAC, electrical, technology, security. Any questions, please contact: Sean Duncanson - Project Manager at sduncanson@hoffman.net or 920-585-8160.

Details

,, 45,414 SF - 35,814 SF. 9,600 SF.
Division 01 - General Requirements, Construction Facilities.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting, Special Coatings.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Earth Moving, Grading, Earthwork Methods, Soil Treatment, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents