Similar Projects
Concrete
Term Contract
Bidding
Owensboro, KY

Concrete Sidewalk and Driveway Replacement
Post-Bid
Versailles, KY

Ready-Mixed Concrete
Term Contract
Post-Bid
Owensboro, KY

Fort Thomas Burney Lane Concrete Repairs
Results
Fort Thomas, KY 41075

Science Plaza Repair
Renovation
Results
Less than $150,000 est. value
Highland Heights, KY 41076

Cement Concrete
Post-Bid
Henderson, KY

Furnishing and Delivery of Flowable Fill and Concrete
Term Contract
Results
Aberdeen, KY

Boone County Schools Concrete Improvements 2021
Post-Bid
Less than $520,000 est. value
KY

800,000 Gallon Prestressed Concrete Clearwell
Results
Henderson, KY

Concrete Replacement/Construction - HB Fife Courthouse
Post-Bid
Elizabethtown, KY

Masonry & Concrete Restoration
Results
KY

Concrete
Term Contract
Post-Bid
Glasgow, KY

Concrete Pavement Removal And Replacement
Results
Less than $1,200,000 est. value
Erlanger, KY 41018

Ready-Mix Concrete
Alteration
Post-Bid
KY

Concrete Retaining Wall Block
Infrastructure
Results
KY

Last Updated 02/16/2022 09:45 AM
Project Title

Hazelwood Exterior Concrete Repairs

Physical Address View project details and contacts
City, State (County) Louisville, KY 40215   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $164,907
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project encompasses repairs to several exterior concrete elements at Hazelwood Intermediate Care Facility. The South Stair at the Employee Parking Lot will be removed and replaced in entirety, along with a new surfacemounted handrail. The North Stair at the Employee Parking Lot will remain as existing, but will receive a new surface-mounted handrail. At the Dumpster area, the concrete dumpster pad, along with the perimeter asphalt, will be removed and replaced. Two engineered rubber curbs will be installed in this location. The West Ramp will have its topper slab removed and replaced, and receive a new surface-mounted guardrail and handrail. The North Ramp will have its topper slab removed and replaced, and will have the existing stair removed and replaced. Both the ramp and the stair will receive new surface-mounted guardrails and handrails. At the Loading Dock, four structural steel HSS columns will be removed and replaced, and will received new footings. The existing guardrail will be removed and replaced with a surface-mounted guardrail.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents