Last Updated | 03/22/2023 10:13 AM |
Project Title | SOF Operations Building, Fort Meade |
Physical Address | View project details and contacts |
City, State (County) | Fort Meade, MD 20755 (Anne Arundel County) |
Category(s) | Entertainment/Recreation, Government/Public, Heavy and Highway, Sewer and Water |
Sub-Category(s) | Convention/Exhibit Center, Military Facility, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Request for Qualifications, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $85,831,169 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | *Contract Award Date: Sep 29, 2022 Contract Award Number: W912DR22C0066 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: R6CPWWDD4AM1 Contractor Awarded Name: GRUNLEY CONSTRUCTION CO., INC. Contractor Awarded Address: Rockville, MD 20850-3390 USA Base and All Options Value (Total Contract Value): $85831169.00 Amendment 01 issued on July 15, 2022 This is a new requirement for the Joint Special Operations Command (JSOCOM). This project shall construct a new permanent SOF Operations Facility, (114,000 SF). Construct a specially designed SOF operations facility of permanent construction for approximately 196 personnel, including supporting facilities with associated site work and environmental measures. The facility will be built on Fort Meade, Maryland and will be a single construction award. The primary facility will be comprised of a two-story structure. The facility includes open office spaces, operations areas, SCIF spaces, large server areas, building utilities and connections and redundant mechanical and electrical systems, secure telecommunication distribution systems, loading/dock platform, and support space. The mission support areas provide joint staff offices, executive offices, labs, collaborative spaces, and meeting rooms. The project consists of core and shell structure and foundations; elevator conveyance systems; electrical/mechanical service and distribution components and systems; fire protection, alarm, and suppression; information technology and infrastructure, communications, and security systems support infrastructure; exterior finishes and weatherproofing. Interiors build out will provide raised access floor systems, acoustically rated interior partitions and ceilings, power, lighting, environmental control, and communications. The majority of the structure will be built to Sensitive Compartmented Information Facility (SCIF) standards. The SCIF areas will be designed per the Intelligence Community Technical Specification ICS 705-1. The project includes redundant primary power, on-site standby generation, and Uninterruptible Power Supply (UPS) systems to ensure continuity of operations. This project requires comprehensive interior design. Support facilities will include primary electrical service to the site, water, sewer, and telecommunications pathways. Includes site preparation and infrastructure improvements, utility services, and perimeter security measures. Site preparation will include standard clearing, grubbing, cut, fill, grading and environmental protection structures. Additional site work consists of curb and gutter, walkways, courtyards, parking lots, roads, drop-off area with retractable bollards, paved loading dock and access road, fire access road, landscaping, and bio-retention areas.Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with Federal laws and Executive Orders. Low Impact Development features will be included in the design and construction this project as appropriate. Cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Construction duration is estimated to be 912 calendar days from notice to proceed.All proposals shall be submitted electronically through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil/. Proposals submitted by mail or hand-carried will not be evaluated. Proposals sent through proprietary or third-party File Transfer Protocol (FTP) sites or DoD SAFE will not be retrieved. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml solNo=W912DR22R0010' to obtain more details.* The estimated magnitude of construction is between $100,000,000.00 and $250,000,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||||
Details | 114,000 SF.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |