Similar Projects
WC-1416 East Madison Street and Vicinity Water Main Replacement - 557-243 - City of Baltimore
Infrastructure
Conception
$4,210,000 CJ est. value
Baltimore, MD 21205

WC-1416 East Madison Street and Vicinity Water Main Replacement - 557-243 - City of Baltimore
Infrastructure
Conception
$4,210,000 CJ est. value
Baltimore, MD 21205

Primrose School / Annapolis
New Construction, Infrastructure - 12,405 SF
Design
$3,000,000 CJ est. value
Annapolis, MD 21403

Defense Logistics Agency (Dla) Site Improvements, Fort Meade, Md
Renovation
Design
$10,000,000 to $25,000,000 est. value
Fort Meade, MD 20755

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

AutoZone #6782 / Odenton
New Construction, Infrastructure - 6,446 SF
Post-Bid
$250,000 CJ est. value
Odenton, MD 21113

AutoZone #6782 / Odenton
New Construction, Infrastructure - 6,446 SF
Post-Bid
$250,000 CJ est. value
Odenton, MD 21113

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

Resurface Parking Lot at Annapolis Readiness Center
Infrastructure
Results
Less than $100,000 est. value
Annapolis, MD 21401

Beverly Triton Nature Park
New Construction
Construction
$3,000,000 est. value
Edgewater, MD 21037

Beverly Triton Nature Park
New Construction
Construction
$3,000,000 est. value
Edgewater, MD 21037

Southdale Shopping Center - 3 Restaurant Pad Sites
Infrastructure
Pending Verification
Glen Burnie, MD 21060

Park Place Hotel
New Construction, Infrastructure - 76,985 SF
Pending Verification
$33,000,000 CJ est. value
Annapolis, MD 21401

Londonderry Court - City of Laurel
Infrastructure
Conception
$250,000 est. value
Laurel, MD 20707

Last Updated 03/22/2023 10:13 AM
Project Title

SOF Operations Building, Fort Meade

Physical Address View project details and contacts
City, State (County) Fort Meade, MD 20755   (Anne Arundel County)
Category(s) Entertainment/Recreation, Government/Public, Heavy and Highway, Sewer and Water
Sub-Category(s) Convention/Exhibit Center, Military Facility, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $85,831,169 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

*Contract Award Date: Sep 29, 2022 Contract Award Number: W912DR22C0066 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: R6CPWWDD4AM1 Contractor Awarded Name: GRUNLEY CONSTRUCTION CO., INC. Contractor Awarded Address: Rockville, MD 20850-3390 USA Base and All Options Value (Total Contract Value): $85831169.00 Amendment 01 issued on July 15, 2022 This is a new requirement for the Joint Special Operations Command (JSOCOM). This project shall construct a new permanent SOF Operations Facility, (114,000 SF). Construct a specially designed SOF operations facility of permanent construction for approximately 196 personnel, including supporting facilities with associated site work and environmental measures. The facility will be built on Fort Meade, Maryland and will be a single construction award. The primary facility will be comprised of a two-story structure. The facility includes open office spaces, operations areas, SCIF spaces, large server areas, building utilities and connections and redundant mechanical and electrical systems, secure telecommunication distribution systems, loading/dock platform, and support space. The mission support areas provide joint staff offices, executive offices, labs, collaborative spaces, and meeting rooms. The project consists of core and shell structure and foundations; elevator conveyance systems; electrical/mechanical service and distribution components and systems; fire protection, alarm, and suppression; information technology and infrastructure, communications, and security systems support infrastructure; exterior finishes and weatherproofing. Interiors build out will provide raised access floor systems, acoustically rated interior partitions and ceilings, power, lighting, environmental control, and communications. The majority of the structure will be built to Sensitive Compartmented Information Facility (SCIF) standards. The SCIF areas will be designed per the Intelligence Community Technical Specification ICS 705-1. The project includes redundant primary power, on-site standby generation, and Uninterruptible Power Supply (UPS) systems to ensure continuity of operations. This project requires comprehensive interior design. Support facilities will include primary electrical service to the site, water, sewer, and telecommunications pathways. Includes site preparation and infrastructure improvements, utility services, and perimeter security measures. Site preparation will include standard clearing, grubbing, cut, fill, grading and environmental protection structures. Additional site work consists of curb and gutter, walkways, courtyards, parking lots, roads, drop-off area with retractable bollards, paved loading dock and access road, fire access road, landscaping, and bio-retention areas.Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with Federal laws and Executive Orders. Low Impact Development features will be included in the design and construction this project as appropriate. Cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Construction duration is estimated to be 912 calendar days from notice to proceed.All proposals shall be submitted electronically through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil/. Proposals submitted by mail or hand-carried will not be evaluated. Proposals sent through proprietary or third-party File Transfer Protocol (FTP) sites or DoD SAFE will not be retrieved. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml solNo=W912DR22R0010' to obtain more details.* The estimated magnitude of construction is between $100,000,000.00 and $250,000,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

114,000 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Curtain Wall and Glazed Assemblies, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Multiple Seating, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents