Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Pavement Repair on Various Streets
Infrastructure
Bidding
Stockton, CA 95204

2022 Paving Projects Phase Three
Infrastructure
Bidding
Lodi, Stockton, CA 95209

A and E On-Call Roadway Construction,District 10
Infrastructure
Post-Bid
$6,425,530 to $10,441,487 est. value

Street Resurfacing On Federal-Aid Streets Fy2020-21
Alteration
Post-Bid
$2,618,546 est. value
Stockton, CA 95206

Brennan Avenue Resurfacing
Infrastructure
Results
$1,140,000 to $1,395,000 est. value
Escalon, CA

South 99 Frontage Road (East) Resurfacing
Infrastructure
Results
$570,000 to $670,000 est. value
Stockton, CA

Replace HMA Pavement and Apply High Friction Surface Treatment.
Infrastructure
Bidding
$1,700,000 est. value

Tracy Various Paving
Term Contract, Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value
Tracy, CA 95304

Road Diet On North Eldorado Street, Turn And Bike Lanes
Infrastructure
Results
Stockton, CA 95214

2022 Paving Project Phase III
Infrastructure
Bidding
Stockton, CA 95209

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Concrete Repairs and Resurfacing
Infrastructure
Results
Stockton, CA

Road District 4 Streets Resurfacing
Infrastructure
Bidding
$350,000 to $432,000 est. value
Stockton, CA

2021 Pavement Rehabilitation Program Project
Infrastructure
Results
$420,000 est. value
Stockton, CA 95207

Last Updated 01/28/2022 02:38 AM
Project Title

California Street Road Diet

Physical Address View project details and contacts
City, State (County) Stockton, CA   (San Joaquin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install 1.2 miles of Class IV and 3.8 miles of Class II bike lanes with lane reduction from four-lanes to two auto lanes along a high bike traffic corridor without existing bike facilities. Project will also include signal upgrades and pedestrian pathway improvements.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents