Similar Projects
Shiocton - Seymour Const / Resur
Infrastructure
Conception
$8,000,000 CJ est. value
Black Creek, WI 54106

Shiocton - Seymour Const / Resur
Infrastructure
Conception
$8,000,000 CJ est. value
Black Creek, WI 54106

T Vandenbroek, CTH JJ Const OPS / RECST
Infrastructure
Design
$2,000,000 CJ est. value
Appleton, WI 54913

T Vandenbroek, CTH JJ Const OPS / RECST
Infrastructure
Design
$2,000,000 CJ est. value
Appleton, WI 54913

RFQ Design - 911 Communication Center Building
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Appleton, WI 54911

Razing and Removing Buildings
Infrastructure, Renovation
Bidding
$52,000 CJ est. value
Kaukauna, WI 54130

Appleton Public Library - BU 01A Testing
New Construction, Infrastructure - 108,000 SF
Sub-Bidding
$39,000,000 CJ est. value
Appleton, WI 54911

Wisconsin Avenue Sidewalk
Post-Bid
Grand Chute, WI

Maple Edge Park & Patriot Park Sports Courts
Post-Bid
$160,000 est. value
Appleton, Little Chute, WI 54913

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Asphalt Pavement Maintenance
Term Contract
Results
Appleton, WI

Stephensville - Shiocton Const / Resurf
Infrastructure
Conception
$3,000,000 CJ est. value
Hortonville, WI 54944

WWTP Aeration Tank #1 Repairs Project
Renovation, Infrastructure
Bidding
$70,000 CJ est. value
Appleton, WI 54911

Heesakker Park Kayak Launch
Post-Bid
Little Chute, WI 54140

Reconstruction of Parking Lot 3 at Appleton Memorial Park
Results
Appleton, WI 54911

Last Updated 08/16/2022 09:32 PM
Project Title

Unit Y-22 : Lead / Galvanized Water Service Line Replacement

Physical Address View project details and contacts
City, State (County) Appleton, WI 54911   (Outagamie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $443,550 [brand] Estimate
Plans Available from Municipal Agency - 03/04/22
Owner View project details and contacts
Architect View project details and contacts
Description

No bid will be opened unless the "Bidders Proof of Responsibility" for 2022 is filed in the office of the City Clerk not later than March 30, 2022. Forms are included in specifications and are also available at the office of the City Clerk. Reference is made to Section 66.0901 Wisconsin Statutes. No bid shall be received unless accompanied by a certified check or a bid bond equal to five percent of the bid, payable to the City as a guarantee that if the bid is accepted, the bidder will execute and file the proper contract and bond within 10 days from the date the lowest responsible bidder's bid is accepted. If the bidder fails to file such contract and bond within the time set by the City, the check or bid bond shall be forfeited to the City as liquidated damages. PROJECT UNIT Y-22 LEAD / GALVANIZED WATER SERVICE LINE REPLACEMENT 3,500 lin. ft. Water Service Line Replacement (trenchless) 100 each Water Service Connections (at basement meter) 100 each Water Service connection at Curb Box (incl. new Box/Stem) 100 each Re-ground water service 100 each Preconstruction scheduling & coordination with homeowner 1,000 sq. ft. 4"/5" Sidewalk Replacement The City reserves the right to reject any and all bids or to accept any bid deemed for the best interests of the City and to waive any informalities in the bidding. The construction work covered by these specifications shall include the furnishing of all materials, equipment, and labor to replace existing private-side lead and galvanized water services, together with such appurtenances as are set forth in the proposal, except those specially stated as being furnished by the City of Appleton. Work under this contract is limited to the private portion of the water service line from the house meter to the city curb box.

Details

Division 14 - Conveying Equipment, Sidewalk Lifts.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents