Similar Projects
Water, Sewer, Drainage and Alternate Paving Improvements for Veranda Section 32
Infrastructure
Bidding
Richmond, TX

Stonecreek Estates Section 8 and Stonecreek Village Drive Extension WSD and Paving
Infrastructure
Bidding
TX

Dry Creek Regional Detention Pond Phase 2
Post-Bid
$844,430 est. value
Rosenberg, TX

Water, Sanitary Sewer, and Drainage Facilities for Sunset Crossing Bryan Road Phase III
Post-Bid
TX

Construction of Long Meadow Farms Section 46, Phase 1A Water, Sewer, and Drainage Improvements
Results
TX

Rehabilitation of Fort Bend County Municipal Utility District No. 119 Drainage Facilities Serving Woodbridge Subdivision
Results
Less than $544,717 est. value
TX

Water, Sanitary Sewer, and Drainage Facilities and Paving and Appurtenances to Serve Post Oak Pointe Section 2
Infrastructure
Bidding
Sugar Land, TX

Construction of Excavation and Grading in Lakeview Retreat West
Post-Bid
TX

Residential Development Including Drainage, Paving, Grading, Water and Wastewater to Serve Highland Meadows, Section One
Results
Less than $1,931,108 est. value
Richmond, TX

Terrace at Cinco Water Distribution System, Sanitary Collection System, Storm Sewer, Detention Pond, and Reinforced Concrete Paving
Infrastructure
Bidding
TX

Construction of Drainage and Paving Facilities in Hunt Road Phase II
Post-Bid
$1,000,000 est. value
TX

Water, Sanitary, Drainage and Paving Facilities in Stonecreek Estates Section 5
Results
Less than $1,100,000 est. value
TX

Water, Sanitary Sewer and Drainage Facilities to Serve Pecan Ridge Section 2
Infrastructure
Bidding
TX

Twinwood Parkway Phase 1B, Segment A and Segment A Bridges
New Construction
Post-Bid
TX

Bonterra at Cross Creek Ranch Detention Reservoir Lake Expansion F2f-3A and F2f-3B Phase 3
Results
Less than $3,510,418 est. value
Richmond, TX 77469

Last Updated 07/07/2021 04:03 PM
Project Title

Water, Sewer, Drainage and Alternate Paving Improvements for Veranda Section 40

Physical Address View project details and contacts
City, State (County) Richmond, TX   (Fort Bend County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Site of the work is Southwest of the intersection of Wildwood Park Road and Great Blue Heron Drive, in Fort Bend County, Texas.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents