Similar Projects
Create 72 Broadway
New Construction - 99,427 SF
Conception
$15,000,200 est. value
Asheville, NC 28801

Kannapolis Crossing
New Construction - 2,300,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Kannapolis, NC 28083

Star Building
New Construction - 40,430 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Asheville, NC 28801

O'Reilly Auto Parts (SHF)
New Construction - 6,800 SF
Design
$500,000 to $900,000 est. value
Sherrills Ford, NC

Mavis Tire / Ocean Isle
New Construction, Infrastructure - 6,979 SF
Bidding
$2,000,000 CJ est. value
Ocean Isle Beach, NC 28469

Walmart Supercenter #1300-608 - CAPX-COMBO
Renovation
Post-Bid
New Bern, NC

Walmart Supercenter #1268-609 - CAPXREF-2
Renovation
Post-Bid
Whiteville, NC

Catawba County ABC Retail Package Store
New Construction - 12,400 SF
Results
Sherrills Ford, NC

Royal Farms #505
New Construction - 5,154 SF
Results
$1,000,000 to $5,000,000 CJ est. value
Washington, NC 27889

One North Center
New Construction - 8,400 SF
Construction
$19,000,000 est. value
Hickory, NC 28601

Novi
New Construction - 15,300 SF
Construction
Concord, NC 28025

Mill Creek Crossing
New Construction - 72,000 SF
Pending Verification
$300,000,000 CJ est. value
Kannapolis, NC 28083

Earnhardt Town Center
New Construction - 28,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Kannapolis, NC 28083

AutoZone #2794
New Construction - 6,000 SF
Conception
$500,000 to $1,000,000 est. value
Davidson, NC 28027

Walmart Supercenter #4224-276 - D8 Pet Cooler
Renovation - 204,488 SF
Design
Conover, NC 28613

Last Updated 09/27/2022 09:25 AM
Project Title

University Bookstore Remodeling

Physical Address View project details and contacts
City, State (County) Boone, NC 28607   (Watauga County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $3,818,200 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

*As of September 27, 2022, Hayco Construction is under negotiations with the owner to finalize the contract. Construction is scheduled to begin in December 2022. The project consists of an interior renovation of the first floor of the University Bookstore (Approximately 15,000 sq.ft.). In addition to architectural and finish items, the renovation includes reconfiguration of existing mechanical, electrical, fire protection, and plumbing. Exterior work includes adding a new entrance and reconfiguration of the existing canopy. Some minor work on the second floor is anticipated to support the renovation. The second floor will be occupied and in use during the full duration of the renovation. Bids will be received for Single Prime General Contractor. All proposals shall be a lump sum. The bidder shall include with the bid proposal the form Identification of Minority Business Participation identifying the minority business participation it will use on the project and shall include either Affidavit A or Affidavit B as applicable. Forms and instructions are included within the Proposal Form in the bid documents. Failure to complete these forms is grounds for rejection of the bid. Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company, insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal, or in lieu, thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the contract in accordance with the bid bond. Said deposit shall be retained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law. A performance bond and a payment bond will be required for one hundred percent (100%) of the contract price. Payment will be made based on ninety-five percent (95%) of monthly estimates and final payment made upon completion and acceptance of work. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 90 days. The owner reserves the right to reject any or all bids and to waive informalities.

Details

15,000 SF - 15,000 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents