Similar Projects
South 23rd Street Sewer Rehabilitation - Phase II - PW-24-12 - City Of Council Bluffs
Infrastructure
Conception
$1,000,000 CJ est. value
Council Bluffs, IA 51501

South 23rd Street Sewer Rehabilitation - Phase II - PW-24-12 - City Of Council Bluffs
Infrastructure
Conception
$1,000,000 CJ est. value
Council Bluffs, IA 51501

Treynor Family Recreation Complex
New Construction, Infrastructure
Design
$4,650,000 CJ est. value
Treynor, IA 51575

Cattlemen's Heritage Beef Processing Plant
New Construction, Infrastructure
Design
$54,000,000 CJ est. value
Council Bluffs, IA 51501

30th Avenue and 25th Avenue Sewer Rehabilitation
Infrastructure
Bidding
$850,000 CJ est. value
Council Bluffs, IA 51501

30th Avenue and 25th Avenue Sewer Rehabilitation
Infrastructure
Bidding
$850,000 CJ est. value
Council Bluffs, IA 51501

East Orchard Avenue Water Main Relocation
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Council Bluffs, IA 51503

East Orchard Avenue Water Main Relocation
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Council Bluffs, IA 51503

CBCSD Early Learning Center Overlot Grading
Infrastructure
Results
Council Bluffs, IA

Clearing and Grubbing - I-80
Infrastructure
Results
IA

Pollard Games Council Bluffs Expansion
Addition, Demolition, Infrastructure - 40,000 SF
Pending Verification
$9,400,000 CJ est. value
Council Bluffs, IA 51501

Valley View Sewer Rehabilitation - PW-27-10 - City Of Council Bluffs
Infrastructure
Conception
$1,000,000 CJ est. value
Council Bluffs, IA 51503

Bahnsen Park Replica Baseball Field (Yankee Stadium) - PR-23-05 - City of Council Bluffs
Infrastructure
Design
$300,000 CJ est. value
Council Bluffs, IA 51501

Railroad Highway Recreation Trail - Phase I
Infrastructure
Bidding
$273,680 CJ est. value
Underwood, IA 51576

450th Street Storm Sewer Improvements
Infrastructure
Post-Bid
$322,688 CJ est. value
Avoca, IA 51521

Last Updated 07/24/2023 10:01 AM
Project Title

Big Lake Park Culvert Repair - REBID

Physical Address View project details and contacts
City, State (County) Council Bluffs, IA 51501   (Pottawattamie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $92,006 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

MAJOR ITEMS OF WORK for this project include the following approximate quantities: 40 LF Storm Sewer, Trenched, RCP, 48 Inch Dia., New Pipe 80 LF Storm Sewer, Trenched RCP, 48 Inch Dia., Salvaged Pipe 80 LF Removal and Salvage of Storm Sewer, 48 Inch Dia. 79 TN Rip Rap and Engineering Fabric Each proposal shall be accompanied by a certified check, bid bond by a surety company registered to do business in the State of Iowa, or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States in the amount of ten percent (10%) of the total bid price and made payable to the City of Council Bluffs. A copy of the certified check, bid bond, or share draft is to be uploaded in the assigned requested attachments area. If a company who has a check is awarded the bid, the City will request the physical check at that time. The certified check or share draft will be returned to the successful bidder once the agreement has been executed. Letters of credit and company or personal checks are not acceptable substitutes for a bid bond and will be cause for rejection of bid. No bidder may withdraw their proposal within 60 days after the bid opening The successful bidder will be required to furnish satisfactory performance and payment bonds in the amount of one-hundred percent (100%) of the total bid price, a certificate of insurance and a certificate of equal employment opportunity and comply with minimum wage provisions as established by the U.S. Department of Labor. Every question or request for clarification or interpretation should be submitted through Online. Such questions or requests should be submitted at least seven (7) days before the date fixed for opening of bids. The work under the proposed contract shall be completed as detailed in the Instructions to Bidders. All work is to be completed on or before September 15, 2023.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents