Similar Projects
Z--PEVI 200745 - Restore North and South Seawalls at Perry's Victory to Safeguard Site
New Construction, Term Contract
Design
$10,000,000 est. value
Put-in-Bay, OH 43456

Miscellaneous - WAS-Marietta Pedestrian Improve
Infrastructure
Bidding
OH

Oakwood Commons Sidewalk
Infrastructure
Bidding
$65,000 est. value
Oakwood, OH

Perrysburg Heights Paving and Parking Lot Improvements
Post-Bid
Less than $138,121 est. value
Bowling Green, OH 43402

Olander Park Whetstone Loop Trail
Post-Bid
Less than $86,940 est. value
Sylvania, OH 43560

Thornport Buckeye Lake Public Access Phase 1 Improvements
Results
$275,000 est. value
Thornville, OH 43076

Hayden and Windermere Concrete Pavement and Catch Basin Repairs
Results
Cleveland, OH 44113

Sidewalk- CLI-Blanchester SRTS FY 22
Infrastructure
Bidding
Clinton County, OH

Downtown Revitalization Curb Ramp Replacement Project
Post-Bid
Wauseon, OH

Design-Build Services for Main Street Plaza
Results
Ashland, OH 44805

Auburn Avenue Improvements
Infrastructure
Bidding
OH 45219

Western Avenue Sidewalk Improvements
Post-Bid
Less than $45,714 est. value
Chillicothe, OH 45601

UIRF Agler Road Sidewalks
Results
Less than $277,273 est. value
Columbus, OH

2021 ADA Curb Ramp Project
Infrastructure
Bidding
Olmsted Township, OH

Parking Lot Resurfacing NCPA RQN Proposal #: 2020-5127810454
Post-Bid
Middletown, OH

Last Updated 10/05/2021 11:49 AM
Project Title

2021 Infrastructure Upgrades

Physical Address View project details and contacts
City, State (County) McDonald, OH 44437   (Trumbull County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Base Bid for this project shall consist of the following work: * E. 5th Street parking lot: Construction of a new parking lot with approximately 2,880 square feet of asphalt pavement, pavement markings, and wheel stops. * Administration Building parking lot: Resurfacing of approximately 9,810 square feet and the construction of 420 square feet of additional pavement to the existing parking lot. * Oregon Avenue: Storm sewer improvements and resurfacing of approximately 3,500 square feet of roadway as well as curb removal/replacement Alternate 1: This project shall consist of the reconstruction of the water tower parking lot. The proposed work includes approximately 4,915 square feet of pavement and the replacement of an existing swing gate with a new cantilever slide gate. Alternate 2: This alternate shall consist of the installation and connection of a gate opener at the water tower parking lot to the newly installed cantilever slide gate.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents