Similar Projects
Buc-ee`s
New Construction - 50,000 SF
Conception
$50,000,000 est. value
Anderson, SC

Spinx Gas Station
New Construction
Conception
Moncks Corner, SC 29461

52 Station
New Construction
Design
Moncks Corner, SC 29430

Spinx #368
New Construction - 4,000 SF
Design
$500,000 to $1,000,000 CJ est. value
Charleston, SC 29414

Circle K
New Construction - 5,200 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
Sumter, SC

Fueling Station Upfit Project
New Construction
Bidding
Rock Hill, SC 29732

QuikTrip #1141
New Construction - 4,993 SF
Sub-Bidding
$1,000,000 to $5,000,000 CJ est. value
Simpsonville, SC 29680

Parker's Kitchen #81
New Construction - 4,922 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Moncks Corner, SC 29461

7-Eleven #42012
New Construction - 4,650 SF
Post-Bid
Blythewood, SC 29016

CDL Training and Propane Fueling Station
Results
Conway, SC 29526

Murphy Express #8935
New Construction - 2,800 SF
Construction
Columbia, SC 29204

Murphy Express #8905
New Construction - 2,800 SF
Construction
$1,000,000 est. value
Lexington, SC 29072

Parker's Gas Station
New Construction - 9,300 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Beaufort, SC 29906

Kroger #448-01 - New Fuel Center
New Construction
Design
Columbia, SC 29229

QuikTrip #1196
New Construction - 7,930 SF
Post-Bid
Graniteville, SC 29829

Last Updated 03/14/2022 12:08 PM
Project Title

Murphy Express #8943

Physical Address View project details and contacts
City, State (County) Columbia, SC 29209   (Richland County)
Category(s) Commercial
Sub-Category(s) Gas Station
Contracting Method
Project Status Permitting, Construction Start Expected April 2022, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Gas Station, 1 Story Above Grade, Approximately 2,800 SF New Construction 8 Fuel Pump(s).
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Rugs and Mats, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents