Similar Projects
Ponderosa Fencing Project
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Anaheim, CA 92802

Skate Park Upgrades
Alteration
Post-Bid
$960,000 est. value
Brea, CA

Wrought Iron Fence For Fire Station 311
Alteration
Post-Bid
Stanton, CA

Stormwater Channel Fencing Upgrades
Alteration
Results
$400,000 est. value
Santa Ana, CA

Cabrillo Park Irrigation Renovation
Renovation, Term Contract, Alteration
Results
$600,000 est. value
Santa Ana, CA

CHP Westminster Security Fence Replacement
Alteration
Post-Bid
Westminster, CA

Stormwater Channel Fencing Upgrades
Term Contract
Results
$350,000 est. value
Santa Ana, CA

Irvine Ranch Water District Well Water Treatment System
Alteration
Post-Bid
$4,500,000 est. value
Orange, CA

Chain - Link Fencing and Gate Installation
Alteration
Results
$200,000 est. value
Santa Ana, CA

Fencing Project #2
Infrastructure
Post-Bid
$400,000 CJ est. value
Garden Grove, CA 92843

Thornton Park Baseball Fencing and Fabric
Infrastructure
Results
$89,000 CJ est. value
Santa Ana, CA 92704

Garden Grove Unified School District GGUSD Fencing Project
Infrastructure
Post-Bid
$600,000 CJ est. value
Santa Ana, CA 92704

CDBG - El Toro Park LodgePole Replacement Project
Infrastructure
Results
$93,485 CJ est. value
Lake Forest, CA 92630

On Call Installation, Maintenance and Repair Services for Fencing and Gates
Term Contract
Post-Bid
$3,000,000 CJ est. value
Santa Ana, CA 92701

Garden Grove Unified School District (GGUSD) Fencing Project
Infrastructure
Results
$1,082,075 CJ est. value
Santa Ana, CA 92704

Last Updated 04/19/2023 06:00 PM
Project Title

Summer Deferred Maintenance 2023 Fence Replacement at various sites

Physical Address View project details and contacts
City, State (County) Tustin, CA 92780   (Orange County)
Category(s) Single Trades
Sub-Category(s) Fencing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $125,000 [brand] Estimate
Plans Available from Municipal Agency - 02/23/23
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall, at its own cost and expense, furnish all construction and other services (including, but not limited to, all labor, materials, tools, equipment, services, administration, supervision, and incidental and customary work) necessary and appropriate to fully and adequately complete the Project in strict accordance with the Contract Documents (Work). Should any detail or dimension be inadvertently omitted from the Plans and Specifications, it shall be the Contractors responsibility to request from the Architect the required details or information and to perform the Work in conformance therewith so that, upon completion of the Work, it will be acceptable and ready for use by the District. Bidder Clarification Request Deadline February 27, 2023 2:00 PM The Tustin Unified School District (District ) is seeking sealed bids from qualified construction contractors for construction of the following public-works project REQUIRED BID SECURITY: Each bid must be submitted with bid security as described in the Instructions For Bidders. CONTRACTOR LICENSE: The class or classes of California contractor licenses required to bid on and perform the Work are: B or C-13. SURETY BONDS: As described in the General Provisions, the successful bidder must provide a Performance Bond and a separate Payment Bond, each in an amount equal to 100% of the total Contract Price, and each issued by a California-admitted surety as defined in Code of Civil Procedure Section 995.120.

Details

Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents