Similar Projects
Last Updated | 08/12/2023 10:11 AM |
Project Title | Boiler #1 and Stack Demolition Northpoint Training Center |
Physical Address | View project details and contacts |
City, State (County) | Danville, KY 40422 (Boyle County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $140,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project Description: This Project involves the complete demolition, removal, and disposal of the existing Boiler No. 1 and the exterior masonry stack and breech way at the boiler house structure at the Northpoint Training Center. Demolition/General Project Tasks include, but are not limited to, the following: - Demolish and dispose of the masonry stack and its foundation. - Demolish stack breech way connection to the existing boiler house structure. Provide for a closure of the remaining wall penetration into the boiler house. - Demolish Boiler No. 1 and legally dispose of all hazardous materials. - Disconnect/Terminate/Cap off any utilities as indicated. - Disconnect/Remove/Partially demolish any piping, conduits, platforms, access, or other materials which connect to Boiler No. 1. Remove and terminate in a safe manner such that remaining structures, piping, etc. is left in a stable (not unsafe) condition. - Remove/Move/Shift any and all other equipment/pads/etc. which may impede the removal of Boiler No. 1 materials. Items that are removed from the building shall be disposed of in a legal manner. Items to remain in the boiler house shall be left in a stable (safe) condition. - Provide for disposal of uncontaminated materials on the Northpoint Training Center site in specified location. All other materials to be legally disposed of offsite. The building does contain hazardous materials which are identified in the Contract Documents. Qualified abatement personnel shall be included on the Contractors team to properly remove, handle, and dispose of such material in a safe and legal manner. Utilities connected to the structure shall be disconnected as indicated on the drawings by appropriate subcontractors who are licensed in each discipline of work including, but not limited to, Electrical, Plumbing, Gas, and any other utilities noted. Work includes site restoration and site improvements. All bids shall be accompanied by a bid guarantee (in the form of a bid bond or certified check) of not less than five (5%) percent of the amount of the lump sum base bid. A 100% Performance Bond and a separate 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instructions to Bidders and/or General Conditions. Bonds should be executed by a surety company authorized to do business in the Commonwealth of Kentucky. Estimated Length of Project: 120 (Substantial Completion) + 15 (Final Completion) NO QUESTIONS WILL BE ANSWERED AT THE SITE VISIT. ALL TECHNICAL QUESTIONS SHALL BE EMAILED TO THE ARCHITECT/ENGINEER OF RECORD FOR THIS PROJECT. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |