Similar Projects
RFQ - Site Utilities, Twin Falls Readiness Center
Infrastructure
Conception
$1,200,000 CJ est. value
Twin Falls, ID 83301

Hankins Pressure Zone Improvements - City of Twin Falls
Infrastructure
Conception
$3,054,750 CJ est. value
Twin Falls, ID 83301

Filer Highway District 3500N Paving
Infrastructure
Post-Bid
Filer, ID

RFQ Construction Manager - Construction Manager/General Contractor Services - Automotive/Agricultural Diesel Mechanics Facility
New Construction, Infrastructure - 40,000 SF
Post-Bid
$15,000,000 CJ est. value
Twin Falls, ID 83301

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Pavement Preservation on US-93
Infrastructure
Results
$500,000 to $1,000,000 est. value
Twin Falls, ID 83303

Grandview Drive Mixed Use
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Twin Falls, ID 83301

Kenyon Meadow Subdivision
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Twin Falls, ID 83301

Blue Lakes Roadside Stream Project - City of Twin Falls
Infrastructure
Conception
$500,000 CJ est. value
Twin Falls, ID 83301

Lud Drexler Dump Station
Infrastructure
Post-Bid
$100,000 CJ est. value
Rock House Place, ID 83302

Idaho Federal Aid Project - Pavement Preservation on US - 93
Alteration
Results
ID

Eastern Sun Subdivision No. 1
New Construction, Infrastructure
Pending Verification
$120,000,000 CJ est. value
Twin Falls, ID 83301

Orchard and Hillcrest Drainage Improvements - City of Twin Falls
Infrastructure
Conception
$350,000 CJ est. value
Twin Falls, ID 83301

Weight Room Addition at Murtaugh High School
Addition, Demolition, Infrastructure
Post-Bid
$900,000 CJ est. value
Murtaugh, ID 83344

Third River Crossing Planning and Environmental Linkage (Pel) Study
New Construction
Results

Last Updated 12/02/2022 08:09 AM
Project Title

I-84, FY23 D4 Bridge Repair

Physical Address View project details and contacts
City, State (County) Kimberly, ID 83341   (Twin Falls County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,248,471 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Joint replacement, patch & repair, concrete overlay, and waterproofing at West Jerome Interchange Please contact the Resident Engineer Seth Helms P.e. AT (208) 544-7903 or seth.helms@itd.idaho.gov for any design related questions. IDOT - I-84, FY23 D4 Bridge Repair

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents