Similar Projects
Brookview Village - Expansion Phase III
Infrastructure
Design
$500,000 to $1,000,000 est. value
Greenfield Center, NY 12833

Dalton Farms Water Meter Project
Bidding
Poughquag, NY

DA/CA Fasteners Replacement and Riser Valve Operators
Infrastructure
Bidding
$8,934,891 to $12,088,382 est. value
Flushing, NY

Water District No. 2 - Phase 7
Post-Bid
Lake Placid, NY 12946

Plastic Water Main Pipe Fit Service Tube
Term Contract
Post-Bid
Rochester, NY

School Street Neighborhood Water Main Replacement
Results
Hudson Falls, NY 12839

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Distribution Water Main Work in Ellwell Crescent and Alderton Street, Etc
Infrastructure
Bidding
$300,000 est. value
Queens, NY 11374

Ro/Di Water Systems Maintenance and Repair
Post-Bid
Syracuse, NY 13210

Water Supply Improvements
Results
Less than $3,075,000 est. value
Philadelphia, NY 13673

Downtown/Main Street Revitalization and Utility Improvement Project
Infrastructure
Bidding
Cortland, NY

Polyethylene Pipe
Post-Bid
Owego, NY

White Sulpher Springs Water District - Phase 9 Water Line Replacement Project
Results
Liberty, NY 12754

Water Main Improvements
Infrastructure
Bidding
$3,500,000 est. value
Rome, NY

Polyethylene Pipe ADS ST (Bell)
Post-Bid
Owego, NY

Last Updated 04/12/2022 10:22 AM
Project Title

Water System Improvements

Physical Address View project details and contacts
City, State (County) Fillmore, NY 14735   (Allegany County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes: Sanford Springs Water Main Extension Extending the existing distribution system across Cold Creek and construct 3,150 LF of new 8 diameter water mains, on County Route 23, Claybed Road, Wells Avenue, and School Street. Replace pre-1950's CIP water main on South Genesee Street (200 L, North Genesee Street (1,100 LF), East Main Street (250 LF), and West Main Street (2,900 LF) in the Hamlet of Fillmore. The East Main Street watermain will be extended with an additional 1.650 LF of new 8" PVC and terminate at the Genesee River. Dugway Road Service Area Extension Extend the existing water main on Dugway Road with approximately 1.800 LF of new 8" PVC. Claybed Road Service Area Extension Install 9,200 LF of new 8 PVC water main, services, and hydrants on Claybed Road between NYS Route 19 and Sanford Springs Extension. The total project includes approximately 15,800 LF of new 8 Dia.; and replacement of 4.450 LF of existing watermain, including all new valves, hydrants, appurtenances, and public side services. A Notice to Proceed is estimated to be issued in June 2022.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 40 - Process Integration.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents