Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 2007 over Mud Run
Demolition, New Construction, Infrastructure
Design
$410,000 CJ est. value
East Fairfield Township, PA 16314

SR 2007 over Mud Run
Demolition, New Construction, Infrastructure
Design
$410,000 CJ est. value
East Fairfield Township, PA 16314

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Asphalt Surface Treatment, Single Asphalt Seal Coat Polymer
Infrastructure
Post-Bid
$100,000 est. value
Conneautville, PA

SR 2012: Porter ST -Barton
Infrastructure
Results
$1,000,000 to $2,499,999 est. value
PA

City of Meadville - LFAR 2021-2022
Infrastructure
Results
$200,000 to $499,999 est. value
Meadville, PA

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Road Project
Infrastructure
Post-Bid
$300,000 est. value
Cambridge Springs, PA

23NW SGL(State Game Lands) 45 and 47 Road Maintenance
Infrastructure
Results
$245,711 CJ est. value
Venango, PA 16440

SR 3004 Brdg/Crooked Ck
Infrastructure
Conception
$1,170,000 CJ est. value
East Fairfield Township, PA 16314

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Construction of Thatcher Run PA-112 Conneautville Dam Rehabilitation, Crawford County
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Conneautville, PA 16406

Last Updated 09/06/2023 09:34 AM
Project Title

Ed Meyer Complex Improvements

Physical Address View project details and contacts
City, State (County) Titusville, PA 16354   (Crawford County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work of the Site General Contract includes, but not limited to, the following, and including all remaining work not identified as work under other contracts. Work of the Site General Contract includes, but not limited to project coordination, permits, bonds, surveying, layout, staking, temporary fencing, removals, erosion and sedimentation control, stake out of improvements, excavation, earthwork, grading, subgrade preparation & compaction, concrete paving, asphalt paving, signage, curb stops and dugout construction. All work on the drawings shall be included in the Base Bid unless otherwise noted on the drawings as an Alternate. All Bidders are herein notified that Minority Business Enterprises (MBEs) and Women Business Enterprises (WBEs) will be afforded full opportunity to submit bids in response to this notice and will not be subjected to discrimination on the basis of race, color, sex or national origin inconsideration for award of the Contract. In addition to the Equal Employment Opportunity requirements of Executive order 11246 regarding discrimination, the CONTRACTOR must establish a 3% goal for WBE participation and a 5% goal for MBE participation in aggregate on-site construction work force for contracts in excess of $10,000.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents