Similar Projects
Easton Park Tract 2A Linear Park
Post-Bid
Austin, TX 78744

District Wide Playground Surface Replacement
Post-Bid
Less than $225,000 est. value
Pflugerville, TX 78660

Wells Branch Parkway at Howard Lane Median Improvements
Results
$280,000 est. value
Austin, TX 78701

Meadows at Chandler Creek Municipal Utility District Trail Extension Phase Two
Results
Less than $208,303 est. value
Austin, TX 73301

Velocity
New Construction - 3,795,000 SF
Pending Verification
$10,000,000 CJ est. value
Austin, TX 78617

Playground Equipment
Post-Bid
Austin, TX

Emma Long Metropolitan Park - Phase I Implementation
Results
$2,506,068 est. value
Austin, TX 78730

The Learning Experience - TLE
New Construction - 15,360 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Bee Cave, TX 78733

Beachside Redevelopment at Galveston Island State Park
Results
$11,625,000 to $13,440,000 est. value
Austin, TX 78744

Easton Park Section 2B Trails
Renovation
Post-Bid
Austin, TX 78750

Arkansas Bend Park Phase II
Results
Less than $1,950,000 est. value
Austin, TX 78767

Renovation of the Existing Demonstration Garden at the District's Community Center
Renovation
Post-Bid
Round Rock, TX 78681

ACC Eastview Childcare Lab Playground Renovation
Term Contract
Results
Austin, TX 78702

2020 Go Bond Program Parks Projects
Renovation
Post-Bid
Pflugerville, TX 78691

Del Valle HS Baseball and Softball Artificial Turf, Field Lighting Installation and Facility Upgrades and Ojeda MS and Dailey MS Artificial Turf and Field Lighting Installation
Results
Del Valle, TX 78617

Last Updated 07/01/2021 10:06 AM
Project Title

Eisenhower State Park Repairs to Drain Field in Bois D'Arc Camping Loop

Physical Address View project details and contacts
City, State (County) Austin, TX 78744   (Travis County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $206,550
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, materials, equipment and incidentals to replace the drain field that operates the Bois D Ark camping loop with new aerobic on-site sewage facility, including all necessary site clearing and permitting with the county. Area to be cleared is approximately 2.2 acres.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents