Similar Projects
Last Updated | 10/26/2021 03:04 PM |
Project Title | Aurelia Park Pond Project |
Physical Address | View project details and contacts |
City, State (County) | Blaine, MN (Anoka County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $290,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Furnishing of all work and materials consisting of approximately: 6294 CY - Common Excavation – Offsite (Ev) 1650 Sy - Salvage And Respread Topsoil 1 Ea - 33” Tideflex Checkmate Inline Check Valve 100 Lf -33” Rc Storm Sewer Pipe 670 Lf - 6” Perforated Pvc Sch 40 Drain Tile Pipe 3 Ea - 33” Rc Flared End Section 10 Ea - Drain Tile Cleanout 1 Ea - 5’ Dia Sump Manhole With Safl Baffle 1 Ea - 6’ Dia Outlet Control Structure 10 Sy - 8’ Wide Bituminous Trail And Aggregate Base 1650 Lf - Silt Fence – Maintained 985 Lf - Construction Limits And Tree Protection Fencing 2815 Sy - Erosion Control Blanket Category 3n, Type Straw 2s 0.40 Ac - Seeding And Turf Establishment 7 Ea - Coniferous Tree, 6-Ft Ht, b&b 11 Ea - Deciduous Tree, 2.5-In Cal, b&b (Including All Related Work And Appurtenances.) |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |