Similar Projects
UO Retainer Program - Consulting Services - Extended Period
Renovation, Term Contract
Bidding

RFP - Land Use Planning
Term Contract
Bidding
Portland, OR 97204

Engineering, Planning and Development
Post-Bid

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Interstate Firehouse Cultural Center Feasibility Study
New Construction, Infrastructure
Results
Portland, OR 97217

ODA Aviation Engineering Services Consulting Services (Engineering/Inspection and Ca) Airport Specific
Infrastructure
Post-Bid

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

Hawthorne Bridge Approach Deck Rehabilitation
Infrastructure
Results
$1,200,000 to $1,400,000 est. value
Portland, OR 97214

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

Jefferson High School AE
New Construction, Infrastructure
Results
Portland, OR

Regional A-E Environmental Services
Renovation, Term Contract
Post-Bid

A/E Services For Flagship Library
New Construction, Renovation, Term Contract - 95,000 SF
Results
$125,000,000 est. value
Cascade Locks, OR 97014

Environmental Consulting Services
Infrastructure
Post-Bid
Portland, OR

Last Updated 09/22/2022 10:24 AM
Project Title

Wastewater Treatment Plant Control System Improvements

Physical Address View project details and contacts
City, State (County) Portland, OR 97230   (Multnomah County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Design Development, Request for Qualifications, Construction start expected July 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $2,797,489 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 21, 2022 an engineer has been selected. No design/construction timeline has been established yet. This project will design, upgrade and modernize the control system at the WWTP. The current control system, comprising of hardware, software, programming, reporting and other functions will be evaluated and updated as necessary to increase reliability and security while modernizing and improving the system. The current control system was originally installed in 2000 and partially upgraded in 2010. Funds from CIP #CIPWW00005 may be used as needed for portions of the project that will repair or replace existing assets. The project is included in the city's 2023 - 2027 Capital Improvement Program (CIP). As of September 22, 2022 an engineer has been selected, however, no design/construction timeline has been established yet.

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents