Similar Projects
SH-51 - Pavement Rehabilitation
Infrastructure
Conception
$3,000,000 CJ est. value
Mannford, OK 74044

Pavement Rehabilitation - SH 48
Infrastructure
Conception
$5,450,000 CJ est. value
Bristow, OK 74010

Pavement Rehabilitation - SH 66
Infrastructure
Design
$5,269,170 CJ est. value
Bristow, OK 74010

Safety Improvement
Infrastructure
Design
$3,501,080 CJ est. value
Sapulpa, OK 74066

Cheyenne Road
Infrastructure
Bidding
$300,000 CJ est. value
Sapulpa, OK 74066

Resurface (Asphalt) SH-67
Infrastructure
Bidding
$1,093,088 CJ est. value
Kiefer, OK 74041

Kum & Go #2362 / Tulsa
New Construction, Infrastructure - 5,620 SF
Post-Bid
$2,000,000 CJ est. value
Tulsa, OK 74133

Mounds Town Hall
New Construction, Infrastructure
Post-Bid
$1,650,000 CJ est. value
Mounds, OK 74047

Bridge Repair Turner Turnpike
Infrastructure
Results
$32,854 CJ est. value
Bristow, OK 74010

Resurface (Asphalt) US-75A
Infrastructure
Results
$657,000 CJ est. value
Sapulpa, OK 74066

Basin N04 Sanitary Sewer Rehabilitation
Infrastructure
Construction
$1,828,039 CJ est. value
Sapulpa, OK 74066

Dutch Bros #OK0409 / Sapulpa
New Construction, Infrastructure - 950 SF
Construction
$500,000 CJ est. value
Sapulpa, OK 74066

New Pre-K Center - 2019 Bond - Bristow Public Schools
New Construction, Infrastructure
Pending Verification
$3,354,946 CJ est. value
Bristow, OK 74010

2019 Bond - Edison Elementary Renovations - Bristow Public Schools
Renovation, Infrastructure
Pending Verification
$546,293 CJ est. value
Bristow, OK 74010

Interchange - IS 44
Infrastructure
Design
$70,400,000 CJ est. value
Tulsa, OK 74131

Last Updated 01/25/2023 09:32 AM
Project Title

Mannford Elevated Water Storage Rehabilitation

Physical Address View project details and contacts
City, State (County) Sapulpa, OK 74066   (Creek County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $334,040 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Mannford Elevated Water Storage Rehabilitation, to Be Constructed for the Creek County Board of County Commissioners on Behalf of the City of Mannford, Mannford, Ok The project includes, but is not limited to, the maintenance and rehabilitation of the 160,000 gallon storage tank as shown on the plans and indicated in the specifications. Proposals shall be accompanied by a cashier's or certified check upon a national or state bank in an amount not less than five percent (5%) of the total maximum bid price payable without recourse to the Owner, or a bid bond in the same amount from a reliable surety company, as a guarantee that the Bidder will enter into a contract and execute performance and payment bonds within ten (10) days after notice of award of Contract to him. Such bid guarantee shall be made payable to the City of Mannford. The successful bidder must furnish a performance and payment bond upon the form provided in the amount of one hundred per cent (100%) of the contract price from an approved surety company holding a permit from the State of Oklahoma to act as surety, or other surety or sureties acceptable to the Owner. Davis Bacon Act wage rules shall apply. All laborers and mechanics employed by contractors and subcontractors on projects funded directly by or assisted in whole or in part by and through the Federal Government shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of Chapter 31 of Title 40, United States Code. The Department of Labor provides all pertinent information related to compliance with labor standards, including prevailing wage rates and instructions for reporting. Creek County and the City of Mannford reserve the right to reject any or all bids, to waive irregularities in the bids and bidding deemed to be in the best interests of the County or City, and to reject nonconforming, nonresponsive, or conditional bids. Bids must remain in effect for 60 days after the bid opening date. No oral interpretation will be made to any Bidder as to the meaning of the Contract Documents or any part thereof. Every request for such an interpretation shall be made in writing to Garver by email to JCHaydock@GarverUSA.com. Any inquiry received forty-eight (48) hours prior to the opening of bids will be given consideration. Every interpretation made to a Bidder will be in the form of an Addendum to the contract Documents, and when issued, will be sent to the Plan Holders list located in the electronic plan room at least twenty-four (24) hours before bids are opened This project is located in Mannford, Oklahoma South off of highway 51 and conrod Drive. A map showing the general location is included in the Plans

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents