Similar Projects
Milwaukee - Fond Du Lac Const / Bridge Rehab
Infrastructure
Conception
$14,000,000 CJ est. value
Hartford, WI 53027

Milwaukee - Fond Du Lac Const / Bridge Rehab
Infrastructure
Conception
$14,000,000 CJ est. value
Hartford, WI 53027

Capstone 41 Business Park Phase II and Phase III
New Construction, Infrastructure - 294,600 SF
Design
$316,400,400 CJ est. value
Germantown, WI 53022

N'Dulge Salon
New Construction, Infrastructure - 1,600 SF
Design
$350,000 CJ est. value
West Bend, WI 53095

Fond Du Lac Avenue, Wb CTH H to Wb STH 28
Infrastructure
Bidding
$6,000,000 CJ est. value
West Bend, WI 53095

Fond Du Lac Avenue, Wb CTH H to Wb STH 28
Infrastructure
Bidding
$6,000,000 CJ est. value
West Bend, WI 53095

2022 Brooklane Drive Phase 2 Utility
Infrastructure
Post-Bid
Kewaskum, WI 53040

2022 Road Program - Town of Erin
Infrastructure
Post-Bid
$450,000 CJ est. value
Erin, WI 53027

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Road Program
Results
Less than $280,000 est. value
Hartford, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Apple Works Winery Expansion
New Construction, Infrastructure - 600 SF
Pending Verification
$30,000 CJ est. value
Germantown, WI 53022

Apple Works Winery Expansion
New Construction, Infrastructure - 600 SF
Pending Verification
$30,000 CJ est. value
Germantown, WI 53022

Sand Drive Mixed Use Development
New Construction, Infrastructure
Design
$70,000,000 CJ est. value
West Bend, WI 53095

Last Updated 03/03/2023 06:33 AM
Project Title

Independence Avenue STH 60-W State St.

Physical Address View project details and contacts
City, State (County) Hartford, WI 53027   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Hartford has been awarded federal funding through the WisDOT Surface Transportation Program (STP) - West Bend Urbanized Area, which is 80% (federal)-20% (local), for the design an approximately 1.3 mile mill and overlay of Independence Av. in the DodgeIndustrial Park. The project would include the addition of street lighting between Liberty Av. and the Rubicon River bridge (B 66 714 95), curb & gutter repair/replacement and other related work. The purpose of this document is to provide interested parties with information to enable them to prepare and submit proposals for the design and preparation of preliminary and final engineering plans, specifications and estimates for the 2705-06-00/70 mill and overlay of Independence Ave, STH 60-W State St. Design is scheduled for FY 2023 a signed contract must be encumbered before June 30, 2023. Construction is scheduled for 3/11/2025, PSE is 11/1/2024. For further information regarding this RFP, contact: John Griffin, PE City Engineer @ jgriffin@hartford.wi.gov The proposed improvements will include: o Pavement evaluation and design for milling and overlay. o Removal and replacement of various sections of curb and gutter where needed. o Addition of street lighting from Liberty Av. north to the Rubicon River bridge (B 66 714 95) o Evaluation of bridge approach drainage and possible removal of curb and gutter and introduction of concrete flumes to improve drainage away from the structure B 66 714 95. o Other related work A summary of the services required include: o Topographic Survey o Preliminary Plans o Preliminary Estimates o Design Reports o Environmental Document o Utility Status Report o Archeological/Historical Coordination and/or Survey o Public Involvement o Agency Coordination and Permits o Utility Coordination o Hazardous Material Investigation (Phase 1) o Meetings o Railroad Coordination o Draft PS&E o Final Structure Plans o Final PS&E

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents