Similar Projects
Last Updated | 03/03/2023 06:33 AM |
Project Title | Independence Avenue STH 60-W State St. |
Physical Address | View project details and contacts |
City, State (County) | Hartford, WI 53027 (Washington County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $700,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The City of Hartford has been awarded federal funding through the WisDOT Surface Transportation Program (STP) - West Bend Urbanized Area, which is 80% (federal)-20% (local), for the design an approximately 1.3 mile mill and overlay of Independence Av. in the DodgeIndustrial Park. The project would include the addition of street lighting between Liberty Av. and the Rubicon River bridge (B 66 714 95), curb & gutter repair/replacement and other related work. The purpose of this document is to provide interested parties with information to enable them to prepare and submit proposals for the design and preparation of preliminary and final engineering plans, specifications and estimates for the 2705-06-00/70 mill and overlay of Independence Ave, STH 60-W State St. Design is scheduled for FY 2023 a signed contract must be encumbered before June 30, 2023. Construction is scheduled for 3/11/2025, PSE is 11/1/2024. For further information regarding this RFP, contact: John Griffin, PE City Engineer @ jgriffin@hartford.wi.gov The proposed improvements will include: o Pavement evaluation and design for milling and overlay. o Removal and replacement of various sections of curb and gutter where needed. o Addition of street lighting from Liberty Av. north to the Rubicon River bridge (B 66 714 95) o Evaluation of bridge approach drainage and possible removal of curb and gutter and introduction of concrete flumes to improve drainage away from the structure B 66 714 95. o Other related work A summary of the services required include: o Topographic Survey o Preliminary Plans o Preliminary Estimates o Design Reports o Environmental Document o Utility Status Report o Archeological/Historical Coordination and/or Survey o Public Involvement o Agency Coordination and Permits o Utility Coordination o Hazardous Material Investigation (Phase 1) o Meetings o Railroad Coordination o Draft PS&E o Final Structure Plans o Final PS&E |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |