Similar Projects
Purchase of Pre-cast Concrete Structures
Infrastructure
Bidding
NC

College Acres Drive and Clear Run Branch Drainage Improvements and Stream Restoration Phase I
Infrastructure, Alteration
Post-Bid
Wilmington, NC 28403

Smith Creek Streambank Stabilization and Sanitary Sewer Reinforcement
Infrastructure
Post-Bid
Wilmington, NC 28411

Drysdale Drive Extension
Results
NC

Coastal Storm Risk Management Ocean Isle Beach, NC
Results
$5,000,000 to $10,000,000 est. value
Kure Beach, Ocean Isle Beach, Wrightsville Beach, NC

Polypropylene Pipe
Results

Sneeden Drive Culvert Replacement
Infrastructure
Results
Ogden, NC 28411

Ditch/Drainage Runoff - Mitigation
Infrastructure
Results
Wilmington, NC 28405

Flood Mitigation Project
Infrastructure
Results
Less than $300,000 est. value
Wilmington, NC 28401

Sanders Rd Sinkhole
Infrastructure
Results
NC

W-5601DH 3rd and Dock Street
Infrastructure
Results
Wilmington, NC 28401

Corrugated Aluminum Pipe
Infrastructure
Results
Castle Hayne, NC 28429

Mott Creek Stabilization/Restoration
Infrastructure
Results
Wilmington, NC

On-Call Foam Stabilization
Infrastructure
Results

Eden Village Infrastructure
Infrastructure
Results
Wilmington, NC

Last Updated 05/03/2022 10:42 AM
Project Title

Coastal Storm Risk Management (CSRM)

Physical Address View project details and contacts
City, State (County) Carolina Beach, NC   (New Hanover County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of dredging, transporting, placing, planting and shaping beach fill and performing all pre and post construction beach surveys. The borrow area for Carolina Beach and Kure Beach is located at the Kure Beach Borrow Area B. The estimated beach fill quantities for Carolina Beach is 865,000 CY. The estimated beach fill quantities for Kure Beach is 920,000 CY. All beach work will not begin until 16 November and must be completed by 30 April. Dredging with hopper dredges will be limited to the period of 16 November through 31 March.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents