Similar Projects
Re-Design Swim and Fitness Center
Renovation, Addition, Alteration
Conception
Westminster, CO 80030

FunPlex Pool Deck Resurface - N749 - City of Greeley
Renovation
Conception
$400,999 CJ est. value
Greeley, CO 80634

Design Build Services for Stadium and Pool
Design
Colorado Springs, CO

Thompson Thrift Multi-Family Residential Development
New Construction, Infrastructure - 1,111,044 SF
Design
Monument, CO 80132

Municipal Pool
Infrastructure
Bidding
$200,000 CJ est. value
Julesburg, CO 80737

RFP D/B - Brighton Recreation Center Water Slide Replacement
Renovation
Bidding
$650,000 CJ est. value
Brighton, CO 80601

UCCS Main Pool Plaster Resurfacing
Infrastructure
Post-Bid
Colorado Springs, CO

Fruita Community Center Aquatic Upgrades
Infrastructure
Post-Bid
Fruita, CO 81521

5 New Flow Through Outdoor Soaking Pools
Results
Salida, CO 81201

Bldg. 404 Pool Liner Replacement
Results
Colorado Springs, CO 80914

Lodge at Black Forest Phase ll
New Construction - 375,358 SF
Construction
$10,000,000 est. value
Colorado Springs, CO 80908

Twin Peaks Lodge and Spa
Renovation, Addition
Construction
Ouray, CO 81427

The Lock at Flatiron
New Construction, Infrastructure - 1,425 SF
Pending Verification
$20,000,000 CJ est. value
Broomfield, CO 80021

Patten Gray Apartments
New Construction, Infrastructure - 4,200 SF
Pending Verification
$90,000,000 CJ est. value
Denver, CO 80204

The Savoy
New Construction, Infrastructure
Conception
$94,306,100 CJ est. value
Fort Collins, CO 80528

Last Updated 03/30/2023 04:43 PM
Project Title

Mestizo-Curtis Pool Reconstruction - 2021 Bond - City of Denver

Physical Address View project details and contacts
City, State (County) Denver, CO 80205   (Denver County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $6,050,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mestizo-Curtis Pool is a popular outdoor aquatic facility located in Denver's oldest park, providing access to swimming and recreation for thousands in a high-need neighborhood in the heart of the city. The pool is past the end of its useful life and requires a replacement to ensure it can continue to serve the community for years to come. This project will provide a new facility that includes a lap pool, leisure pool/play features, a bathhouse and restroom building. As of March 30, 2023, this project is in the planning/development phase. Design is expected to start Quarter 3, 2023. It is anticipate construction will start Quarter 3, 2024 with completion in Quarter 4, 2025.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents