Similar Projects
Hotel Casino Sanitary Sewer And Potable Water System Improvements
Renovation
Post-Bid
Immokalee, FL

Resurface 2 Basketball Courts at C.S.F.P.
Post-Bid
$30,000 est. value
Naples, FL

Sun-N-Fun Water Park Restoration and Renovation Project
Post-Bid
Naples, FL 34109

Design Build Step 1 - Northeast Water Treatment Building Project
New Construction
Results
$5,000,000 to $7,500,000 est. value
Naples, FL 34116

Water Treatment Plant Accelator No. 2 Improvements
Results
Naples, FL

Tennis Center Courts Resurfacing
Results
Naples, FL

BCB Electrification of Cork 2 and FU5 Generator Addition, Package 2
Alteration
Post-Bid
$1,718,534 to $1,899,433 est. value
Naples, FL 34117

North County Regional Water Treatment Plant and Isle of Capri Surge Control System
Results
Less than $870,000 est. value
Naples, FL 34120

Mackle Park Playground Shade Structures
Results
Less than $69,400 est. value
Marco Island, FL 34145

Tennis Center Courts Resurfacing
Renovation
Results
$30,000 est. value
Naples, FL 34102

Naples Beach Hotel & Golf Club Redevelopment
New Construction, Demolition
Construction
$10,000,000 CJ est. value
Naples, FL

Poinciana Professional Park Access
Results
Less than $610,294 est. value
Naples, FL 34105

North Collier Regional Park - Basketball Court Repair and Resurfacing
Renovation
Results
Naples, FL 34110

North Collier Regional Park - Basketball Court Repair and Resurfacing
Renovation
Results
Naples, FL 34110

Tower Packing Media Replacement For Water Treatment Plants
Renovation, Alteration
Bidding
$300,000 est. value
FL

Reported 03/16/2022 12:00 AM
Project Title

South County Regional Water Treatment Plant (SCRWTP) and Carica P.S. Field Trailer

Physical Address View project details and contacts
City, State (County) Naples, FL   (Collier County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of the South County Regional Water Treatment Plant (SCRWTP) & Carica P.S. Field Trailers Project located in Collier County, Florida

Details

Water Treatment Plant, New Construction, Park/Playground, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents