Similar Projects
Town Hill Water Storage Tank Replacement Project
Infrastructure
Bidding
$3,600,000 est. value
Ipswich, MA 01938

Rehabilitation of the Bourne Hill and West Wareham Steel Water Standpipes
Infrastructure, Alteration
Bidding
$2,450,000 est. value
Wareham, MA

Beebe and Doeskin Tank Cleaning
Post-Bid
Framingham, MA

Pressure Washing and Recoating of the Exterior Surfaces
Post-Bid
Less than $250,000 est. value
Clinton, MA

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Champion City Recovery - Rail Tarping Station Replacement
New Construction
Pending Verification
Brockton, MA 02301

Bourne Hill and West Wareham Tank Rehabilitations
Infrastructure
Bidding
Wareham, MA

Supply and Installation of an Ice Bridge at the Indian Head Heights Water Storage Tank Site
Post-Bid
Less than $40,000 est. value
Framingham, MA

Z--CACO Marconi Water Tower Repair and Painting
Results
$250,000 to $500,000 est. value
Wellfleet, MA

Rehabilitation of Water Storage Facilities
Infrastructure
Bidding
$1,100,000 est. value
Lynnfield, MA 01940

Water Tanks Maintenance and Asset Management
Term Contract
Post-Bid
Canton, MA

World-Wide Water Storage Tank Remediation
Term Contract
Results

Seekonk High School Domestic Hot Water Tank
Infrastructure
Post-Bid
$80,000 est. value
Seekonk, MA 02771

CACO - Temporary Potable Water Storage
Results
Wellfleet, MA

Reported 02/24/2022 12:00 AM
Project Title

Water Filter Plant Bulk Tank Installation

Physical Address View project details and contacts
City, State (County) Southbridge, MA   (Worcester County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $15,000
Plans Available from Municipal Agency - 02/09/22
Owner View project details and contacts
Architect View project details and contacts
Description

Includes rigging and plumbing of new bulk chemical storage tanks.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents