Similar Projects
Hurricane Damage Replacement of Gym Floor at Immaculate Conception Cathedral School (ICCS)
Renovation
Sub-Bidding
$390,000 CJ est. value
Lake Charles, LA 70601

Replacement of Gym Floor at Plainview High School
Renovation
Sub-Bidding
$150,000 CJ est. value
Glenmora, LA 71433

Luxury Vinyl Tile Installation
Alteration
Post-Bid
Baton Rouge, LA

Purchase of Carpet and Tile
Alteration
Post-Bid
LA

Purchase or Installation of Multipurpose Flooring System
Alteration
Results
$48,860 est. value
Lake Charles, LA

Lakefront Parking Garage - Phase II
New Construction, Alteration
Results
Lake Charles, LA

Dotson Gym Flooring
Renovation
Sub-Bidding
$156,000 CJ est. value
Bastrop, LA 71220

Removal and Replacement of Gym Floor at Bolton High
Alteration
Post-Bid
Alexandria, LA 71301

Remove Existing and Replace with New Flooring at the Johnny Jacobs Playground
Alteration
Results
Gretna, LA

Lafa Opelousas Building Flooring Replacement
Alteration
Post-Bid
Opelousas, LA 70570

Carpet and Interior Paint - Council Chambers
Alteration
Results
$30,000 est. value
Mandeville, LA

Replacement of LPCC Food Service Floor
Alteration
Post-Bid
Lafayette, LA 70501

Dorm Carpet Replacement
Term Contract
Results
Barksdale AFB, LA 71110

Annual Flooring for CD Rehabilitation Project
Term Contract
Post-Bid
Lafayette, LA

Carpet Cleaning
Alteration
Results
New Orleans, LA

Last Updated 09/19/2022 10:31 AM
Project Title

Restroom Floor Repairs

Physical Address View project details and contacts
City, State (County) New Orleans, LA 70116   (Orleans County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $6,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

*THIS EVENT IS REPLACING EVENT 2403* The Contractor shall provide all labor, materials, tools, equipment, facilities, supervision, management, financing, services, shop drawings, submittals, testing, and other items necessary for the proper execution and functioning and shall make all installations and connections necessary, specified, customary, or otherwise appropriate to perform fully and to complete in every respect the contract work generally described as follows: (Specification or drawing references included in the following statement of Subcontract work are applicable but not necessarily all inclusive Site Visit - Contact George Coman - 504-504-473-0222 or David Munson - 504-329-3038 Treme Recreational Center - 900 N Villere New Orleans, LA: Restroom Floor Repairs Provide Labor, Equipment and Materials. (4) Restrooms - (11' X 12') (11' X 12') (9' X 8'0 (9 X 8') VCT Flooring. Remove existing VCT Flooring, Glue underlayment and sand to concrete. Install new VCT flooring to match existing. Glue down. Vinyl Base. Remove existing vinyl base. Install new vinyl base to match existing. Remove all construction debris and dispose off site. Repair any damage caused to site during work performed. All materials, equipment, supplies, fasteners, and other items required to perform work tasks to be supplied and installed by contractor. All trash and debris to be removed by contractor and hauled off. Do not use City dumpster. lean area when work is complete. Area to be ready for business use when finished. If any equipment is found to be defective it is to be identified to owner for approval of repair/replacement. All material shall conform to the latest issue of all applicable standards established by NEMA, and underwriters' laboratories, inc. and shall bear manufacturer ' s trade and brand name. All work shall be installed and completed with the latest rules and regulations of the ASME, NFPA,NEC and all State and local codes and standards and such work not so installed shall be removed and reinstalled at the Contractor ' s expense. Warranties on all furnished equipment and industry standards on parts and labor, all manufacturers' warranties should apply. Personal Protective Equipment to be worn at all times and a safe working environment is to be maintained Q and a open: August 23, 2022 7:30:00 PM Q and a close: August 27, 2022 1:30:00 AM

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents