Similar Projects
Masonry Reconstruction - Electrical
Bidding
Less than $200,000 est. value
Urbana, IL

Sunset Marina Electrical Repairs And Upgrades
Alteration
Bidding
Less than $428,186 est. value
Rock Island, IL 61201

Generator
Post-Bid
Fairview Heights, IL 62208

Holiday Lighting and Decorating Services for the Mill Creek Special Service
Term Contract
Post-Bid
Geneva, IL

HVAC Equipment Replacement
Results
Evanston, IL 60201

Building B Boiler Replacement Service
Results
Crystal Lake, IL 60012

Replace Mechanical Systems
Alteration
Bidding
Less than $5,000,000 est. value
Chicago Heights, IL 60411

Abandoned Rooftop Equipment Removal
Post-Bid
Palatine, IL 60067

Hot Water Heater Replacement
Results
Rock Island, IL 61201

Misc. Cooling Tower And Structural Work
Infrastructure
Bidding
Oswego, IL

On Call HVAC Repair Services
Term Contract
Post-Bid
West Chicago, IL 60185

AC Nielsen Tennis Center LED Lighting
Results
Winnetka, IL 60093

Switchgear Testing & Preventive Maintenance
Term Contract
Bidding
Waukegan, IL

On Call Electrical Repair Services
Post-Bid
West Chicago, IL 60185

NEIU Replace Electric Cable, Phase 1
Results
$1,500,000 to $2,000,000 est. value
Chicago, IL 60625

Last Updated 06/24/2021 03:45 PM
Project Title

Boiler Replacement

Physical Address View project details and contacts
City, State (County) Bement, IL 61813   (Piatt County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $243,300
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Disconnection, removal and replacement of an existing George Otto, commercial-steel, steam boiler with an existing output capacity of roughly 9,000 MBH. Two (2) new, cast-iron sectional boilers with modular burners will be installed and assembled on site to serve the existing school building(s), sized to match the current boiler capacity and reconnected to the existing steam distribution system and controls. A new condensate receiver and boiler circulation pump(s) will also be included for the new system. New boiler flues will reconnect to the existing boiler flue/stack along with modification and reuse of the existing combustion air intake louver.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents