Project Title | Weld County School District RE-1 Mechanical / Electrical / Pool Equipment Renovation |
Physical Address | View project details and contacts |
City, State (County) | Gilcrest, CO 80623 (Weld County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $650,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | the Weld RE-1 – Valley High School East Gym – Mechanical / Electrical / Pool Equipment Renovation Project (Project) located at 310 9th Street, Gilcrest, CO 80623 The Project generally includes: the replacement two (2) existing, failing gas-fired boilers within the existing mechanical/pool room – feeds central hot water systems in building. Provide glycol feed system. Pool equipment to switch to a sealed tank type filtration system to reduce mechanical room corrosion. New pool equipment will require new structural platform. New pool equipment will require new pumps to feed new tank system. Increase ventilation at boiler room and main electrical room – new roof penetrations and mechanical equipment. Replace three (3) electrical panelboards in the mechanical boiler room. The construction budget is approximately $650,000. The entire project shall achieve Substantial Completion and be operational on or before September 29, 2023. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |