Similar Projects
Manhole & Structure Coring And Sawing
Term Contract
Post-Bid
Minneapolis, MN 55401

2021 Stabilize And Pave Road Bed
Post-Bid
MN

Zachary Lane Elementary School - 2021 LTFM
Renovation
Results
Less than $1,200,000 est. value
Minneapolis, MN 55442

Notch and Widen, Mill and Overlay
Results
$1,485,291 est. value
Okabena, MN 53053

2021 Roads Maintenance
Renovation
Post-Bid
Red Wing, MN

CSAH 34 Reconstruction
Results
Fergus Falls, MN 56537

DNR3 Sand Dunes South Road Lifting
Post-Bid
Big Lake, MN 55309

Stabilized Full Depth Reclamation and Bituminous Paving
Results
Jackson, MN 56143

DNR2 Aitkin Area Road Grading
Term Contract
Post-Bid
Aitkin, MN

CSAH 42/Akron Avenue Intersection Improvements
Results
Less than $2,700,000 est. value
Hastings, MN 55033

TH 7/22 and Montana Avenue Northwest Crossing Improvements
Post-Bid
$290,618 est. value
Hutchinson, MN 55350

Webber-44 (CSAH 152 & CSAH 57) Reconstruction
Results
Minneapolis, MN

DNR3 Aspen Forest Road Upgrade
Renovation
Post-Bid
MN

CSAH 22W and Members Parkway
Results
Rochester, MN

2021 Street Maintenance
Post-Bid
Saint Louis Park, MN

Reported 04/14/2021 12:00 AM
Project Title

CSAH 21 Reconstruction

Physical Address View project details and contacts
City, State (County) MN   (Isanti County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Located on CSAH 21 from TH 95 to the North County Line. The major estimated quantities are; 1 LS mobilization; 1 LS clearing and grubbing; 772 LF remove pipe culvert; 19961 CY common excavation; 19044 CY common borrow; 2450 TON aggregate surfacing; 9950 TON aggregate base; 15071 SY full depth reclamation; 3800 TON bituminous mix; 925 CY aggregate bedding; 4 EA 24” RC pipe apron; 2 EA 36” RC pipe apron; 6 EA 28” span RC pipe-arch apron; 22 EA 15” GS safety sloped apron; 2 EA 18” GS safety sloped apron; 606 LF 15” CS pipe culvert; 72 LF 18” CS pipe culvert; 170 LF 24” RC pipe culvert; 82 LF 36” RC pipe culvert; 218 LF 28” span RC pipe-arch culvert; 400 LF concrete curb and gutter design D418; 1 LS traffic control; 5700 LF silt fence; 256 LF sediment control log blanket system; 2000 LBS fertilizer type 3; 4559 SY sodding; 1625 SY rapid stabilization; 9 ACRE seeding, 9 ACRE disk anchoring; 27 TON mulch; 19888 LF 4” line paint.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents