Similar Projects
Foothill Strip Mall
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Rock Springs, WY 82901

Foothill Strip Mall
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Rock Springs, WY 82901

White Mountain Water Well
Infrastructure
Post-Bid
$100,000 CJ est. value
Rock Springs, WY 82901

Addition or Significant Renovation to Existing Space for a Health Science Building - Western Wyoming Community College
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Rock Springs, WY 82901

Milling Plant Mix, Bituminous Pavement Surfacing and Miscellaneous Work
Infrastructure
Results

Pavement Surfacing, Rigid Concrete Overlay, Removal of Concrete, Bridge Rehabilitation, Temporary Concrete Barrier, MGS Guardrail, a+b Bidding and Miscellaneous Work
New Construction, Infrastructure
Results

Rogue Plumbing Office and Shop
New Construction, Renovation, Infrastructure
Pending Verification
$300,000 CJ est. value
Rock Springs, WY 82901

Pipeline Estates Subdivision
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Green River, WY 82935

Track Re-Surfacing Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Rock Springs, WY 82901

Bituminous Pavement Surfacing
Infrastructure
Results

Gateway D2.2 Proposed Transmission Line Project
Infrastructure
Pending Verification
$4,000,000 CJ est. value
Winton, WY 82945

Lagoon Road Reconstruction Project
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Winton, WY 82945

District 2 Chip Seal
Infrastructure
Results

Sweetwater County School District #2 Inclusive Playground
Infrastructure
Post-Bid
$300,000 CJ est. value
Green River, WY 82935

Mill and Overlay, Right-of-Way Fence Replacement
Infrastructure
Results

Last Updated 05/12/2023 03:31 PM
Project Title

2023 Asphalt Overlay Project

Physical Address View project details and contacts
City, State (County) Winton, WY 82945   (Sweetwater County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,570,456 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A certified check, cashier's check, or bid bond made payable to the Sweetwater County Clerk in an amount equal to ten percent (10%) of the bid shall accompany each bid as a guarantee that if the bond is accepted, the bidder shall execute a signed contract and furnish the Contractor's Bond within 10 working days after the Notice of Intent to award the contract. No bid may be withdrawn for a period of 30 days after the date of the bid opening. All bids are to be prepared in accordance with the contract documents which were prepared by Sweetwater County located in Green River, Wyoming. Bidders are advised that Wyoming Statutes 16-6- 102, 16-6-103, and 16-6-104 regarding a five percent (5%) preference shown to Wyoming Contractors, the limitation of subcontracting no more than thirty percent (30%) of the contract work, and preference for Wyoming products, are applicable to the Project. Bidding Documents will be furnished for review in connection with the preparation of bids in the Director of Public Works' Office, Sweetwater County Courthouse, 80 West Flaming Gorge Way, Suite 23, Green River, WY 82935. Any questions regarding the biddings documents or the work to be performed in relation to the above described project shall be directed to Gene Legerski, P.E., Sweetwater County Director of Public Works at 307-872-3921. No bids will be considered which are not submitted on the original proposal forms, signed by the authorizing representative of the bidder and submitted in the envelope clearly marked 2023 ASPHALT OVERLAY PROJECT. No bids will be considered in which the Proposal, Specifications, or any Provisions have been modified. Bids must be received in the office of the Director of Public Works of Sweetwater County on or before the time and date specified. Bids received after the time specified will not be considered and will be returned unopened to the bidder. The Board of County Commissioners of Sweetwater County hereby notifies all bidders that minority business enterprises will be afforded full opportunity to submit bids in response to this Invitation and will not be discriminated against on the grounds of race, religion, sex, color, national origin, age or disability. All bids will be presented to the Board of County Commissioners of Sweetwater County for their acceptance and awarding the contract(s) at their regular meeting, held on Tuesday, April 18th, 2023 at 9:00 a.m. in the Meeting Room of the Board of County Commissioners. The Board of County Commissioners of Sweetwater County reserves the right to reject any or all bids, to waive any informalities or technical defects in bids, as may be in the best interest of Sweetwater County. No verbal explanations, clarifications, additions, or instructions will be binding to either Sweetwater County or the Bidders, except those confirmed in writing. A signed contract, furnished to the successful bidder, results in a binding contract without further action by either party. Questions concerning this Advertisement for Bid should be directed to Mr. Gene Legerski, P.E., Public Works Director, Sweetwater County, 80 West Flaming Gorge Way, Suite 23, Green River, Wyoming 82935. Phone: (307) 872- 3921, Fax: (307) 872-3991 or Email: legerskig@sweetwatercountywy.gov.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents