Similar Projects
500 North - Independence Avenue to 600 West - City of Provo
Alteration
Conception
$600,000 est. value
Provo, UT 84606

Center Street Arch - City of Provo
Infrastructure
Conception
$1,000,000 est. value
Provo, UT 84601

Lakeview Business Park
New Construction
Design
$1,500,000,000 est. value
Tooele, UT 84074

Ben Lomond Golf Course Mixed Use
New Construction - 40,836 SF
Design
Harrisville, UT 84414

Jarvie Contact Station Construction
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Dutch John, UT 84023

Huntington State Park Restrooms Building
Demolition, New Construction, Infrastructure
Bidding
$472,000 CJ est. value
Huntington, UT 84528

Sanctuary
New Construction, Infrastructure
Sub-Bidding
$155,000,000 CJ est. value
Lehi, UT 84043

Purchase and Deliver Well Casing for FORGE
Term Contract
Sub-Bidding
Salt Lake City, UT 84111

Public Works SCADA System Upgrade 2021
Post-Bid
$385,000 est. value
Lindon, UT

1500 East Force Main Improvements Project
Renovation
Post-Bid
Vernal, UT

Ferron and Huntington Creek Stabilization
Results
Castle Dale, UT 84513

Power Building Site Work
Results
Salem, UT 84653

Costco
New Construction
Construction
Riverton, UT 84065

Station Park North Site Development
New Construction, Alteration
Construction
Farmington, UT 84025

Antelope Animal Hospital Parking Expansion
New Construction, Alteration
Pending Verification
Syracuse, UT 84075

Last Updated 07/28/2022 01:05 PM
Project Title

Town of Garden City South Well

Physical Address View project details and contacts
City, State (County) Garden City, UT 84028   (Rich County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Lift and Pump Stations, Plumbing, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $650,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The South Well consists of drilling, construction, developing and testing of the culinary production well to meet drinking water standards and related work.Owner anticipates that the Project's total bid price will be approximately $650,000. The Project has an expected duration of 180 days. Bidding Documents may be downloaded from the designated website. Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. The Project, of which the Work under the Contract Documents is a part, is generally described as follows: Consists of drilling, constructing, developing, and testing of a 16-inch diameter culinary water well to meet drinking water standards and related work

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents