Similar Projects
Drain Degreaser Services
Term Contract
Bidding
Moody AFB, GA

Goodyear Clubhouse Renovation - Plumbing
Bidding
Cartersville, GA 30120

Plumbing Renovations
Post-Bid
Thomasville, GA 31757

Hot Water Heater Replacements
Post-Bid
Athens, GA

Plumbing Services 2019
Term Contract
Results
Warner Robins, GA

Electrician Services 2019
Term Contract
Results
Warner Robins, GA

Demolition Services
Bidding
Perry, GA 31069

45--Sink and Plumbing Installation
Post-Bid
Fort Benning, GA 31905

Government Center Building Plumbing
Results
Gray, GA

Copper Tubing
Post-Bid
GA

Grady High School - Plumbing to Modular Units
Results
Atlanta, GA 30309

Columbus State University Corn Center Piping Replacement
Post-Bid
Columbus, GA 31901

Plumbing Services
Results
GA

Kitchen Grease Trap Cleaning (Annual Contract)
Term Contract
Post-Bid
GA

All Mechanical, Electrical and Plumbing Work
Results
Lakeland, GA 31635

Last Updated 11/11/2019 05:57 PM
Project Title

Plumbing Services for Clayton County

Physical Address View project details and contacts
City, State (County) Riverdale, GA 30274   (Clayton County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Provide the Installation of a 1500-gallon grease trap in series with existing grease trap, which shall include the following: 1. Perform utility locate service; 2. Saw cut parking lot and remove asphalt; 3. Excavate to install 1500-gallon grease trap 4. Make final connections from existing trap to new trap and tie in to sewer main; 5. Install risers with manhole rings and covers to grade; and Back fill and tamp. 2. Replace existing 8" sewer main from manhole, which shall include the following: 1. Perform utility locate services; 2. Saw cut parking lot from manhole to lift station; 3. Install new 8" PVC sewer main with proper slope/ fall to insure 4. proper flow and drainage to accommodate new grease trap; 5. Make final connections at manhole and lift station tank; and 6. Back fill and tamp excavation back to grade for asphalt repairs by others. 3. Replace 4" sewer line from fitness center side of senior center to 8" sewer main, which shall include the following: Perform utility locate services; Saw cut necessary portion of parking lot to replace sewer line to tie into the 8" sewer main; Install new 4" PVC sewer line; Install 4" clean out at the building and every 80" till it ties into the main per code; and Back fill and tamp excavation grass area to grade and in the parking lot to asphalt repair depth (4").

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents