Similar Projects
Graceland Avenue Residential Development
New Construction, Demolition, Infrastructure - 187,000 SF
Conception
$20,000,000 est. value
Des Plaines, IL 60016

BMW Parking Lot Expansion
Alteration
Design
Orland Park, IL 60467

Rodenburg Road Improvements - Irving Park Road to Village Limits - Village of Schaumburg
Infrastructure
Design
$4,791,456 est. value
Schaumburg, IL 60193

Pavement Preservation and Rehabilitation North - 2021
Infrastructure
Bidding
$500,000 est. value
Arlington Heights, Mount Prospect, Palatine, Schaumburg, Streamwood, IL 60056

I-294 Roadway and Bridge Reconstruction and Widening
Renovation, Infrastructure
Bidding
$100,000,000 est. value
Chicago, IL

Construction Management Services Pavement Preservation and Rehabilitation Services at Various Locations
Post-Bid
Chicago, IL

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

Grand Avenue Improvements
Renovation
Results
Chicago, IL 60600

2021 Street Improvement Program
Results
Less than $464,820 est. value
Morton Grove, IL

Milwaukee Avenue, Logan Boulevard to Belmont Avenue - 38467 - City of Chicago
Alteration
Design
$16,800,000 est. value
Chicago, IL 60641

Roadway Reconstruction and Widening
Infrastructure
Bidding
$1,000,000 est. value
Chicago, IL

HMA Resurfurfacing
Post-Bid
IL

Pleasant Lane Improvements
Renovation
Results
Glenview, IL 60025

Grand Avenue Water Main Improvements
Infrastructure
Bidding
$1,700,000 est. value
Northlake, IL 60164

Niles West High School 2021 Paving and Sealcoating
Post-Bid
Skokie, IL 60077

Last Updated 06/28/2022 11:52 PM
Project Title

Green Alley Improvements - Phase 2 and 3

Physical Address View project details and contacts
City, State (County) River Forest, IL   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Green Alley Improvements - Phase 2 & 3 Project consists of the reconstruction of 11 alleys in the Village of River Forest. The project will be completed in two phases to minimize resident disruption. The project includes the installation of pervious pavers and concrete alley pavement. A 6th perforated underdrain is proposed through the length of each alley, with a connection to the existing storm water system.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents