Similar Projects
Dove at Kirkwood and Carroll at Federal Way Intersection Improvements
Infrastructure
Bidding
Southlake, TX

S Normandale Street at Las Vegas Intersection Project
Infrastructure
Bidding
Fort Worth, TX 76116

2021 Sidewalk Unit Price Contract
Post-Bid
Fort Worth, TX 76102

Bear Creek Intermediate School Sidewalk Improvements
Post-Bid
Keller, TX 76248

Installation of New Sidewalk in the City of Bedford Parks System
Results
Bedford, TX 76021

Cravens Park Trail Improvements
Results
$217,269 est. value
Arlington, TX 76018

Parking Lot Expansion
Term Contract
Bidding
Fort Worth, TX

Maintenance and Operations Bus and POV Parking Lot Expansion
Infrastructure
Post-Bid
Keller, TX

Concrete Rehabilitation
Term Contract
Results
Fort Worth, TX 76135

SH 180 - Pedestrian, Sidewalks and Curb Ramps
Infrastructure
Bidding
$1,648,775 est. value
TX

Park Row Drive Sidewalk Improvements
Infrastructure
Post-Bid
$440,000 est. value
Arlington, TX 76012

2020 Downtown Street Rehabilitation Contract 1
Results
Fort Worth, TX 76102

Traffic Signal Improvements at Bailey Boswell Road at Knowles Drive
Infrastructure
Bidding
Saginaw, TX

West Bank Renovation
Results
$1,200,000 est. value
Fort Worth, TX 76102

North Pate Orr Sidewalk Improvements Project
Results
$174,809 est. value
Keller, TX 76244

Last Updated 07/01/2021 09:38 AM
Project Title

FY 2021 Colleyville Sidewalk Connectivity Project

Physical Address View project details and contacts
City, State (County) Colleyville, TX   (Tarrant County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes constructing a new sidewalk and barrier free ramps at five (5) locations. Three (3) of the sites are included as part of the base bid, while two (2) of the sites are included as Additive Alternative Bids. The improvements include minor grading, adjustments to various appurtenances, and site preparation. A description of the site locations and approximate length of sidewalk is described below: LD Lockett Reatta (Base Bid)-1,800 LF, Cheek Sparger and Bedford (Base Bid)-800 LF, Thompson Terrace (Base Bid)-550 LF, Bandit Trail (Additive Alternate Bid)-850 LF, Bluebonnet (Additive Alternate Bid)-1,100 LF.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents