Similar Projects
Last Updated | 07/01/2020 09:22 AM |
Project Title | Manchester-Boston Regional Airport Elevators and Escalators Maintenance and Replacement Project MHT |
Physical Address | View project details and contacts |
City, State (County) | Manchester, NH (Hillsborough County) |
Category(s) | Single Trades |
Sub-Category(s) | Conveying Systems |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Design-Build replacement of one (1) existing hydraulic freight elevator and two (2) existing transportation grade escalators in the Airport Terminal and the concurrent performance of a five-year term full-coverage preventative & scheduled maintenance and service contract for all of the escalators, elevators, and powered moving walkways equipment at the AIRPORT. The current inventory of vertical transportation equipment (VTE) at the AIRPORT consists of six (6) hydraulic elevators, three (3) traction elevators, nine (9) escalators, and four (4) moving walkways. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |