Last Updated 12/04/2018 03:51 PM
Project Title

Construction of the Morning Star (South) Residential Drainage Mitigation

Physical Address View project details and contacts
City, State (County) NM   (Sandoval County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Project consists of re-grading the backyards of homes south of Morningstar Dr. for mitigation of stormwater flows through the lots. Construction also consists of retaining wall structures between and back of the lots, regrading a retention pond and cleaning out existing outfall culvert. Underground stormwater management curb inlets, pipe storm drains, and manholes will be constructed to address runoff from Morningstar Drive.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents