Similar Projects
HVAC/Refrigeration Service
Bidding
KY

KCIW Pine Bluff Chiller Replacement
Bidding
$127,262 est. value
Pewee Valley, KY 40056

HVAC Filters
Post-Bid
KY

Concourse a Pre-Conditioned Air Chiller
Post-Bid
Erlanger, KY

HVAC Preventative Maintenance
Results
Fort Wright, KY

Conner High School HVAC Improvements
Results
Hebron, KY

Installation of HVAC Systems
Bidding
Hustonville, KY 40437

Carrier I-VU HVAC Control System
Post-Bid
Fort Wright, KY

Ockerman Elementary School HVAC Upgrades
Results
Florence, KY 41042

Mechanical HVAC – Boiler Replacement
Bidding
Stanford, KY 40484

HVAC Service
Term Contract
Post-Bid
Fort Mitchell, KY 41017

Reiley Elementary School Gymnasium AC
Results
KY

Jack C. Fisher Park Concession Building HVAC Upgrade
Post-Bid
Owensboro, KY 42301

Boone County Schools Geothermal Upgrades
Results
KY

Sawyer Hayes Conference Center Chiller Replacement
Renovation
Post-Bid
Less than $434,149 est. value
Louisville, KY 40241

Last Updated 02/03/2021 10:21 AM
Project Title

HVAC Replacement Repairs Phase 3

Physical Address View project details and contacts
City, State (County) Jackson, KY 41339   (Breathitt County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $109,391
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will be to replace existing packaged-rtu hvac units at brjdc. remove existing RTU’s and install new rtu packaged units, as indicated in the design drawings. new programmable thermosats for all new and existinf RTU’s @ brjdc. see drawings for additional information. no additional square footage is planned. no walls are being removed or relocated. the existing gas entry is being modified because of pressure issues and this is part of the overall work scope. electrical & plumbing will include reconnection of existing gas & electrical to new RTU’s or install new as indicated in the design drawings. care shall be taken to not damage any roof material. this building is under high security at all times. contractors working in these buildings must adhere to special conditions described in the specifications. residents will not be present in building during the work period. all materials shall be delivered prior to start of work to reduce owner’s time for relocation of residents.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents