Similar Projects
Erosion Control
Infrastructure
Design
$570,764 CJ est. value
West Harrison, IN 47060

Intersect. Improv. W/ Added Turn Lanes - US 50
Infrastructure
Design
$403,503 CJ est. value
Bonnell, IN 47022

RFP - Construct Single Family Residential Homes
New Construction, Infrastructure
Post-Bid
$30,000 CJ est. value
Aurora, IN 47001

Drainage Improvements on Us 50 Near Greendale Plaza Drive
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Greendale, IN 47025

Intersection Improvement With Added Turn Lanes
Infrastructure
Results
$1,713,217 CJ est. value
Bonnell, IN 47022

Community Crossing Paving Program
Infrastructure
Results
$594,506 CJ est. value
Lawrenceburg, IN 47025

Sellersburg Family Scholar House - Ivy Tech Community College
New Construction, Infrastructure
Pending Verification
$1,900,000 CJ est. value
Lawrenceburg, IN 47025

Road Five HMA and Drainage Projects
Infrastructure
Pending Verification
$15,227,000 CJ est. value
Guilford, IN 47022

Intersection Improvement With Added Turn Lanes
Infrastructure
Post-Bid
$3,904,765 CJ est. value
Bonnell, IN 47022

Small Structure Replacement - SR 48
Infrastructure
Results
$930,000 CJ est. value
Aurora, IN 47001

Scooter's Coffee / Lawrenceburg
New Construction, Infrastructure - 666 SF
Post-Bid
$50,000 CJ est. value
Lawrenceburg, IN 47025

Bridge Replacement - Bridge 29
Demolition, New Construction, Infrastructure
Post-Bid
Hogan Township, IN 47001

Bridge Replacement - Bridge 29
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Aurora, IN 47001

Pedestrian Intersection Improvements
Infrastructure
Post-Bid
$400,000 CJ est. value
Lawrenceburg, IN 47025

RFQ/P Construction Manager - Construction Manager as Constructor Services for the Construction of the Downtown Capital Projects
Infrastructure
Post-Bid
$300,000 CJ est. value
Lawrenceburg, IN 47025

Last Updated 05/02/2023 11:03 AM
Project Title

South Dearborne Athletics Facility

Physical Address View project details and contacts
City, State (County) Aurora, IN 47001   (Dearborn County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $5,469,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of April 5, 2023, this project has not yet. A timeline for award has not yet been established.**   0280174, 320-344-GEO1 Bids may be delivered to the following location until the time as indicated: SOUTH DEARBORN COMMUNITY SCHOOL CORPORATION 6109 Squire Place Aurora, IN 47001 Bids received after the date and time set for receipt and opening of bids as herein indicated will be returned unopened. Bids will be received for a single prime contract. DOCUMENT AVAILABILITY: Documents will be available on a deposit basis while supplies last. After the supply is gone, documents will be available on a non-refundable basis only. DEPOSIT will be refunded in full upon return of Construction Documents to Architect/Engineer in good condition within ten (10) days after date of Bid Opening. FORFEIT OF DEPOSIT: When documents are not returned under the conditions specified, none of the deposit will be refunded. Bids shall include BID SECURITY in the form of a Bid Bond or certified check in the amount of a sum no less than 5 percent of the Bid Sum including all add alternates. The Owner reserves the right to accept or reject any or all bids and to waive any irregularities in bidding. Base bids may be held for the following period before award of Contract: Ninety (90) Days. Should a successful Bidder withdraw his bid of fail to satisfactorily execute all of the requirements and enter into a written Contract within ten (10) days after Notice of Acceptance of his bid, the Owner may declare the Bid Security forfeited, not as a penalty, but as liquidated damages. The successful Bidder shall furnish a Performance Bond and Payment Bond from an approved surety company, which will remain in full force and effect for a period of one (1) years after date of final acceptance of work. Performance Bond and Payment Bond shall be in an amount equal to the following percentage of the Contract Sum: One hundred percent (100%) Direct questions in writing by email to gfisher@lancerassociates.com

Details

1 Story Above Grade, 9,280 SF.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents