Similar Projects
Streamgage Removal
Alteration
Design
Santa Barbara, Wheeler Springs, CA

Streamgage Removal
Alteration
Design
Santa Barbara, Wheeler Springs, CA

Sump Pumps Removal and Installation Services
Infrastructure
Bidding
$150,000 est. value
Los Angeles, CA 90012

Seawater Intrusion Prevention (SWIP) Well Equipping Project
Infrastructure
Bidding
$4,500,000 est. value
Aptos, CA

Drilling and Construction of Well 32 and 33 Project
Infrastructure
Post-Bid
Colton, San Bernardino, CA 92324

Well Pumping Plant 31, Fogg Street
Infrastructure
Post-Bid
$1,600,000 to $1,800,000 est. value
Colton, CA 92324

Grayson Well 69 (Replacing Well 274)
Infrastructure
Results
$2,449,000 est. value
Grayson, Modesto, CA 95363

Treated Water Booster Pumps
Alteration
Results
CA

Well No. 34 - Drilling of a Municipal Water Well Project
Infrastructure
Bidding
$917,235 est. value
Porterville, CA

Martin Slough Flow Enhancement Project
Alteration
Post-Bid
Eureka, CA 95503

Well Abandonment Project
Infrastructure
Results
Riverside, CA 92519

Furnish and Install New Pump and Assembly at Pump Station 2B
Infrastructure
Bidding
$149,000 est. value
Fresno, CA

Installation of Groundwater Well
Term Contract
Post-Bid
$117,500 est. value
Wheatland, CA 95692

Plumas National Forest Brush Creek Fuel Pump Repair
Term Contract
Results
$25,000 to $100,000 est. value
Berry Creek, CA 95916

Washington Well Improvements: Well Drilling (Phase I)
Infrastructure
Bidding
$3,340,000 est. value
Santa Ana, CA 92701

Reported 06/14/2022 12:00 AM
Project Title

Water Source Test Well Drilling, Independence

Physical Address View project details and contacts
City, State (County) CA   (Inyo County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected July 2022, Construction Completion Expected November 2022
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Water Source Test Well Drilling, Manzanar National Historic Site. The contractor shall provide all equipment, labor and materials necessary to construct a water source test well. Work includes drilling, well casing, pump testing, conducting a video inspection log, and securing well head. Construct a water source test well for Manzanar National Historic Site. Work includes drilling and setting temporary conductor casing; drilling a borehole to an anticipated depth of approximately 260 feet below land surface; installing stainless steel shutter well screen with gravel-pack; installing PVC water well casing with formation stabilizer; installing surface seal material around the permanent well casing; well development, conducting a step-drawdown pumping test; conducting recovery test; conducting a video inspection log, disinfecting the completed test well, and securing the well head at the completion of the work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents