Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

Air Purification Systems
Post-Bid
Chatham, Pound, Victoria, VA 23936

Hiden Hussey/Commons Dining Hall Select Roof and HVAC Replacement
Results
$200,000 to $299,999 est. value
Newport News, VA

HVAC Replacement for Kiln Creek Elementary School
Results
$200,000 to $299,999 est. value
Newport News, VA 23602

Armstrong SF665DW Heater Replacement Parts
Post-Bid

HVAC Replacement - Telecommunications Building
Results
Newport News, VA 23606

HVAC Replacement - Gatewood Academy/PEEP
Post-Bid
$500,000 est. value
Newport News, VA 23601

HVAC Preventive Maintenance and On-Call Services
Term Contract
Results
Altavista, Bedford, Covington, Lynchburg, Newport News, Onancock, Winchester, Wytheville, VA 24523

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Preventive Maintenance and On-Call Services
Term Contract
Results
Emporia, Farmville, Newport News, Norfolk, Onancock, South Hill, Williamsburg, VA 23185

BAF Maintenance
Term Contract
Post-Bid
Fort Eustis, VA

HVAC Automation and Maintenance Services
Alteration
Results
Newport News, VA 23602

Metro Hanger HVAC
Alteration
Post-Bid
Henrico, VA 23250

Building Control Unit Removal and Installation
Alteration
Results
Newport News, VA 23602

Condensate Accumulator - James River Treatment Plant (JRTP)
Alteration
Post-Bid
Newport News, VA 23602

Last Updated 07/18/2022 04:23 AM
Project Title

HVAC Replacement - Dunbar Erwin Elementary School

Physical Address View project details and contacts
City, State (County) Newport News, VA 23607   (Newport News City County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of an educational facility in Newport News, Virginia. Completed plans call for the renovation of a educational facility. Remove and replace existing HVAC systems at An Achievable Dream Academy Dunbar Erwin Elementary School located at 726 16th Street Newport News, VA 23607. PN - 21-057

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 33 - Utilities.
Division 40 - Process Integration.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents